Projects
ICRC superintends and regulates PPPs in Nigeria
FEC approved PPP Projects
UPDATE ON CONCESSIONS GRANTED AND IMPLEMENTED FROM 2010 | ||||||||||
S/N | Project Name & Description/ Current Status | MDA/ Grantor | FBC Issue Date | Concessionaire | PPP Process | Value of Concession (Project cost) | Approval Date/Duration of Concession | |||
1 | Provision of Engineering Infrastructure for Katampe District, FCT Design, Finance, Build and Transfer of Engineering Infrastructure for Development of Katampe
Status: PPP Currently on Hold | Federal Capital Development Authority (FCDA) | ICRC FBC Compliance Certification: 9 Feb, 2010
| Deanshanger Project Limited | Solicited; Open | NGN 61,194,747,645 | FEC Approval: May, 2010 Duration: 8 years | |||
2 | Lekki Deep Sea Port Development and Operation of A Deep Water Port in the Lagos Free Trade Zone at Ijebu Lekki, Lagos State Status: PPP currently at Implementation Phase | Federal Ministry of Transportation / Nigeria Ports Authority | ICRC FBC Compliance Certification: March 2011
| Lekki Port LFTZ Enterprises | Solicited; Open | NGN 504,000,000,000 | FEC Approval: April, 2011 Duration: 45 years | |||
3. | Security, Monitoring and Enforcement Concession NIMASA wishes to effectively enhancing the security of ships and ports, minimising the incidents of piracy and armed robbery at sea, and other incidents of maritime security breaches within the Nigerian waters, and generally protect the Maritime domain in consonance with the International Maritime Organisation (IMO) conventions. Status: Project on Hold | Nigerian Maritime Administration and Safety Agency (NIMASA) | ICRC FBC Compliance Certificate: 16 Aug, 2011
| Global West Vessel Specialist Nigeria Limited | Restricted Bidding (Sole Source) with Security Clearance by ONSA | NGN 37,224,000,000 | 3rd April 2012 Duration: 10years | |||
4 | Kainji Hydro Electric Power Plant Concession of the Hydropower to improve national power generation Status: Project at Implementation Phase | BPE / Federal Ministry of Power | In view of Emergency in the Power sector, ICRC supported BPE on the transaction for National Interest | Mainstream Energy Solutions Limited | Solicited; Open | NGN 114,690,823,560 | February, 2013 Duration: 30 years | |||
5 | Shiroro Hydro Electric Power Plant Concession of the Hydropower to improve national power generation Status: Project at Implementation Phase | BPE / Federal Ministry of Power | In view of Emergency in the Power sector, ICRC supported BPE on the transaction for National Interest | North South Power Company Limited | Solicited; Open | NGN 48,692,526,480 | February, 2013 Duration: 30 years | |||
6 | Development of Phase 4B Port Facilities at Onne Oil and Gas Free-Zone | Federal Ministry of Transportation (FMoT) | Deep Offshore Services Nigeria Ltd | Unsolicited | NGN 1,020,952,173,789.90 | 17 May, 2013 | ||||
7 | Construction of Berth 21 at Greenview Terminal Apapa | Federal Ministry of Transportation (FMoT) | Green View Limited | Solicited; Open | NGN 41,506, 944,577.0 | 28 Mar, 2014 | ||||
8 | Development of FESTAC Phase 2 Housing Estate, Lagos Concession for the Reclamation and infrastructural Development of the land Status: Yet to commence due to Court cases with Amuwo Odofin Community Chiefs | Federal Ministry of Lands, Housing & Urban Development / Federal Housing Authority | New FESTAC Property Development Company Ltd | Solicited: Open | NGN 18,983,650,000.0 | 8 Sep, 2014 Duration: 30 years | ||||
9 | Debt Management Office (DMO) Complex DMO proposes to provide modern office complex, involving the design, finance, build, operate, maintain and transfer of the building; and receive rents and service charges derived from the lease of 15 floors of the first tower and all 20 floors of the second tower Status: Project yet to achieve Financial Close | Debt Management Office | ICRC FBC Compliance Certification: 23 Jan, 2015 | LOH & OR Construction Company Limited | Unsolicited; Swiss Challenge Procurement | NGN 41,506, 944,577.0 | FEC Approval: 13 May, 2015
Duration: 30 years | |||
10 | Trans-Nigeria Gas Pipeline: Nigerian (Solicited Proposal): The project involves the construction of 614km gas pipeline from Ajaokuta to Kano (AKK) with off take Gas Stations in Abuja, Kaduna and Kano. Status: Contracts for Lot 1 and Lot 3 were signed in April 2018 while that of Lot 2 was not executed. Lot 2 was shared to Lots 1 and 3, which became Segments 1 and 2. These are being negotiated by the EPC Contractors, the Chinese financial institutions and the NNPC for financial close | Federal Ministry of Petroleum / Nigeria National Petroleum Corporation (NNPC) | ICRC Compliance Certification: 10 July, 2017 | Lot 1: Oando/OilServe consortium Lot 3: China Petroleum Pipeline (CPP)/Brentex consortium | Solicited; Open | NGN 1,022,000,000,000.0 | FEC approval: 13 Dec, 2017
| |||
11 | Development of Hydroelectric power at existing Small & Medium dams across the Country Development of Hydroelectric power from existing 6 Small & Medium from dams across the Country Federal Executive Council (FEC) gave an approval on the 30th November 2016 for 6 dams. 1. Bakolori Dam, Zamfara State 2. Omi - Kampe Dam, Kogi State 3. Ikere Gorge Dam, Oyo State (swiss challenge) 4. Jibiya Dam, Katsina State 5. Zobe Dam, Katsina State
| Federal Ministry of Power, Works & Housing (Power) | FBC issued: 29 Oct 2018 |
| Solicited; Open | 1. Bakolori Dam, Zamfara State - ₦ 1,553,167,000.0 2. Omi - Kampe Dam, Kogi State ₦1,212,452,500 3. Ikere Dam, Oyo State (swiss challenge) ₦ 3,650,000,000.0 4. Jibiya Dam, Katsina State ₦ 1,315,470,000.0 5. Zobe Dam, Katsina State ₦ 434,630,000.0 | FEC approval: (one approval for small Dams) Duration: 30 years March 27, 2018 | |||
12 | Warehouse in a Box– Abuja and Lagos The Project seeks to provide physical infrastructure – an insulated warehouse, made up of pre-engineered modular components (prefabricated insulated expanded polystyrene sandwiched panels) – as well as the fittings and operating components, including offices, furnishings, racking, kitting, security and office equipment. | Federal Ministry of Health | ICRC FBC Compliance Certification: 6 Sept 2018 | MDS Logistics Ltd | Solicited; Open | NGN 668,880,000.0 | FEC Approval: 28 Nov, 2018 Duration: 5 years | |||
13 | Roof Top Solar Powered Project, Power House Design, Build, Finance, Operate a 750kw Day Time and 75kw Night Time Hybrid Solar Power Facility in a PPP arrangement at the Power House, Maitama, Abuja | Federal Ministry of Power, Works and Housing (Power Sector) | ICRC FBC Compliance Certification: 27 Feb, 2018 | Proserve Energy Services Ltd | Solicited; Open | NGN 690,079,950.0 (Equipment Only) | FEC Approval: 13 Sep, 2018 Duration: 10 years | |||
14 | Ado Ekiti, Ekiti Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Agro Universal Consortium | Solicited; Open | NGN 485,767,625.0 | FEC Approval: 19 Sep, 2018
Duration: 10 years | |||
15 | Akure, Ondo Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Agro Universal Consortium | Solicited; Open | NGN 105,775,991.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
16 | Bauchi, Bauchi Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Agro Universal Consortium | Solicited; Open | NGN 128,663,089.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
17 | Bulasa, Zamfara Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Matrixville Consortium | Solicited; Open | NGN 2,073,800,654.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
18 | Ezillo, Ebonyi Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Ebony Agro Industries Limited | Solicited; Open | NGN 1,893,793,273.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
19 | Gaya, Kano Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Agro Universal Consortium | Solicited; Open | NGN 236,930,364.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
20 | Gombe, Gombe Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Servewell Agricultural Service Limited | Solicited; Open | NGN 429,426,464.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
21 | Ibadan, Oyo Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Independent Grain Handling and Storage Limited | Solicited; Open | NGN 575,912,947.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
22 | Igbariam, Anambra Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Coscharis Farms Limited | Solicited; Open | NGN 254,241,286.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
23 | Ikenne, Ogun Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Agro Universal Consortium | Solicited; Open | NGN 626,505,802.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
24 | Jahun, Jigawa Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Matrixville Consortium | Solicited; Open | NGN 487,677,696.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
25 | Jos, Plateau Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Agro Universal Consortium | Solicited; Open | NGN 176,688,747.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
26 | Kaduna, Kaduna Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Matrixville Consortium | Solicited; Open | NGN 541,806,691.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
27 | Kwali, Abuja Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Matrixville Consortium | Solicited; Open | NGN 2,246,942,955.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
28 | Lafiagi, Kwara Concession and Leasing of Grain Storage Facilities | ICRC FBC Compliance Certification: 12 Jun, 2018 | Matrixville Consortium | Solicited; Open | NGN 227,649,132.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | ||||
29 | Makurdi, Benue Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Upland Grains Production Company Limited | Solicited; Open | NGN 442,382,759.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
30 | Minna, Niger Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Niger Resources Limited | Solicited; Open | NGN 3,759,277,152.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
31 | Ogoja, Cross River Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Agro Universal Consortium | Solicited; Open | NGN 27,613,845.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
32 | Sokoto, Sokoto Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Agro Universal Consortium | Solicited; Open | NGN 196,719,866.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
33 | Uyo, Akwa Ibom Concession and Leasing of Grain Storage Facilities | Federal Ministry of Agriculture and Rural Development (FMARD) | ICRC FBC Compliance Certification: 12 Jun, 2018 | Neon Farms Africa Consortium | Solicited; Open | NGN 182,163,107.0 | FEC Approval: 19 Sep, 2018 Duration: 10 years | |||
34 | ECOWAS Biometric ID Cards System This project involves the adoption of smart card and biometric technology to secure the identification of documents as a prerequisite for managing migration and to enhance regional security, which is the outcome of the deliberation of ECOWAS Heads of Governments in order to meet the challenges posed by migration. | Federal Ministry of Interior | ICRC FBC Compliance Certification: 24 May, 2018 | Euphoria Press Limited | Unsolicited Bid | NGN 14,700,000,000.0 | FEC Approval: 28 Nov, 2018 Duration: 10 Years | |||
35 | Development of Abuja-Warri Railway Line with Branch Line and Extensions from Jakura-Lokoja and Agbarho-Warri (ii) Warri New Sea Port The 2-projects are: i. Abuja-Baro-Itakpe-Ajaokuta-Warri Railway Line (269.12km) with branch and extension lines to Jakura-Lokoja (41km) and Agbarho-Warri (5km) ii. Development of Warri new Seaport, Warri, Delta State The preferred PPP project model is Design-Build-Operate and Transfer (DBOT) designed to promote passenger and freight services, promote regional infrastructure development, preserve the life span of roads, encourage inter-model transport system, job creation and promote economic recovery and growth plans of the Federal Government, etc.
| Federal Ministry of Transportation | FBC issued: 27 Nov 2018 | Messrs. China Railway Construction Company International (CRCC(I)) | Solicited | NGN3.199 billion for the railway and N880.089 million for Warri new sea port. | November, 2018 | |||
36 | Concession of the Power Components of Gurara 1 30MW Dam
This is for the O & M of the dam, as the FMoWR has completed the construction of this facility and its multi-purpose assets. | Federal Ministry of Water Resources | FBC issued: 18 Mar 2019 | Solicited; Open | ₦ 6,679,288,975.0 | May 19, 2019 | ||||
37 | Development of Small & Medium Enterprise (SME) Portal Project
A technology enabled platform project that will encourage more MSMEs to be attracted into the formal sector | Federal Ministry of Industry Trade and Investment | FBC issued: 26 Apr 2019 | Solicited; Open | May 19, 2019 | |||||
38 | Gurara Facility Management
The project involves procurement of a Facility Manager to manage, operate and maintain all infrastructure facilities and services in Gurara dam. | Federal Ministry of Water Resources | FBC issued: 26 Apr 2019 | Solicited; Open | May 19, 2019 | |||||
39 | Establishment of Military & Paramilitary Clothing & Accessories Factory at DICON, Kaduna State Establishment of selected weapons and military equipment assembly lines Powered Generating set
| Federal Ministry of Defence | FBC issued: 01 Feb 2019 | Sur Corporate Wear | Solicited; Open | US$13 million | 12th July, 2019 | |||
40 | Development, deployment and management of Automated Customs Gateway Portal for Import Duty Exemption Certificate (IDEC) and Imported Vehicle identification Number Registration (VREG) (Revalidated)
Development, deployment and management of Automated Customs Gateway Portal for Import Duty Exemption Certificate (IDEC) and Imported Vehicle identification Number Registration (VREG) | Federal Ministry of Finance, Budget and National Planning | FBC issued: May 2019 | Four Core Technology solution Ltd. | Solicited; Open | ₦10 Billion. | FEC Approval: October 30, 2019 Concession Period: 10 years | |||
41 | Design, Development, Deployment and Management of a Secure Automated Fare Collection (AFC) Solution for the Nigerian Railway Corporation (NRC) Rail Network. | Federal Ministry of Transportation/ Nigerian Railway Corporation | FBC issued September 2019 | Secure ID Nigeria ltd | NGN 900,000,000.0 | FEC has approved FBC Compliance Certificate 29th January, 2020 concession period 10 years | ||||
42 | The Renovation of Students Hostel
The proposed project is for the rehabilitation of student hostels within Kaduna Polytechnic premises. The hostels will be managed to ensure highest standard of living conditions for the students. | Federal Ministry of Education (Kaduna Polytechnic) | FBC issued: 12 Feb 2020 | Mark Point Multilinks Ltd | Unsolicited | Seven Hundred and forty-four Million, Two Hundred and Sixty-four Thousand Naira Only (N744,264,000.0). | FEC Approval: 08 July, 2020 Duration: 19 Years | |||
43 |
Presidential Initiative on Custom Modernization “E-Customs Project” | Nigeria Custom Service (NCS) | FBC issued: 22 May 2019 | Trade Modernization Project Ltd. | NGN3.1 Billion | September 20, 2020 | ||||
44 | Rehabilitation, Expansion and Operation of the Nigerian Correctional Service Shoe, Garment and Leather Factories
An unsolicited proposal for the Rehabilitation, Expansion and Operation of the Nigerian Prisons Service Shoe Factory (NPS SF) Aba, Abia State under Public Private Partnership between Erojim Investment limited (EIL) and the Nigeria prisons service.
| Nigeria Correctional Service (NCS) | FBC issued: 6 May 2020 | Messrs. Erojim | Solicited; Open | Total Cost for Shoe Garment and Tannery US$11,866, ,865 | 7th Oct 2020 | |||
45 | Development of Port Harcourt Railway Industrial Park
The FGN intends to develop a Railway Industrial Park in Ubima, Rivers State through PPP arrangements with the following facility components for commercial vehicles and rolling stock assembly, Oil and Gas materials supply Industrial Park, Textile Industrial Park, Light Industry Park for Fast Moving Commodities and Goods (FMCGs).
| Federal Ministry of Transportation | FBC issued: 24 Aug 2020 | China Civil Engineering Construction Corporation Ltd. (abbreviation CCECC) | Solicited; Open | US$291,253,619 | 7th Oct 2020 | |||
46 | Development of Bonny Deep Sea Port
The FGN intends to develop the Bonny Deep Water Port through PPP arrangements in order to improve transportation opportunities and boost economic activities along south-south, south east, north central and north east geo-political economic corridors and ease pressure on the western ports – Apapa and Tin Can Island which at the moment handles about 90% of cargo throughput in the country | Federal Ministry of Transportation | FBC issued: 24 Aug 2020 | China Civil Engineering Construction Corporation Ltd. (abbreviation CCECC) | Solicited; Open | US$550,025,361 million | 7th Oct 2020 | |||
47 | Ibom Deep Sea Port Project (Solicited Proposal): The Ibom Deep Sea Port (IDSP) project involves the development of a Greenfield Deepsea Port and accompanying Free Trade Zone (FTZ) in Akwa Ibom State in the South-South geopolitical zone of Nigeria. The proposed Port and FTZ are part of the proposed Ibom Industrial City initiative that will be established on a 14,400-hectare site donated by the Akwa Ibom State Government (AKSG) at no value. The IDSP project is intended to become a major national and regional economic gateway that will provide additional container handling capacity for the country. In addition to containers, the IDSP is expected to handle petroleum products (export and import), crude oil and natural gas (export), vehicles (import) and bulk trade in natural resources (import and export).
| Federal Ministry of Transportation (FMoT) Federal Ministry of Transportation / Akwa Ibom State Government | September 17, 2020 | Bollore/Power China Consortium Bollore Africa Logistics-PowerChina International Group Limited | Solicited | $USD 2.016 Billion US$2,016,198 billion | December 16 2020 | |||
48 | Deployment of Police Specialised Services Automation project The project is the automation of police services to capture revenues accruing to the police through specialised services like VIP coverage etc, and remit same to the force. | Nigeria Police Force | FBC issued 15th Dec 2020, revalidated on Tuesday 13th July 2021 | Parkway Projects Limited | Unsolicited | NGN 2,047,726,450.0. | FEC approval on Wednesday 14th July 2021 | |||
49 | The NAHCON seek to engage a private sector operator to DFBOT a building at its landed property located at Hajj Complex, along Katsina Road, Kano State. The plan is to build a 4blocks complex housing 376 units of shops, 8 portal steel blocks, a mosque, convenience and parking spaces | National Hajj Commission of Nigeria (NAHCON) | FBC issued November 22, 2021 | DID Al-Amana Nigeria Limited | Unsolicited | NGN 1812.7 Billion
| FEC approval December 12, 2021 | |||
50 | Deployment of a Revenue Assurance System (RAS) | Federal Ministry of Communications/Nigeria Communications Commission (NCC) | FBC Issued December 17, 2021 | 3R Revenue Assurance ltd | Solicited | NGN11.9 Billion | FEC approval January 26, 2022 concession period 10 years | |||
51 | Onitsha River Port project
This project will serve as a pilot scheme for concession of other River ports under PPP arrangements namely: Onitsha, Lokoja, Baro and Oguta River Ports. Onitsha River Port located in Anambra State is being funded under the IDA Credit. | Federal Ministry of Transport (FMoT)/ National Inland Waterways Authority (NIWA) | FBC Issued August 23, 2021 | Universal Elysium Consortium | solicited | NGN 3,935,833,337.0 | FEC approval February 2, 2022 Concession period 30 years | |||
52 | Federal Coastal Fishery Terminal, Ebughu, Akwa Ibom State | Federal Ministry of Agriculture and Rural Development | 28 Feb 2018, (revalidation) September 27, 2021 | Messrs Alfin Fisheries Limited | Unsolicited | N3,685,055,000.00 (Three Billion, Six Hundred and Eighty-Five Million and Fifty-Five Thousand Naira. | FEC approval February 16, 2022 concession period 11 years | |||
53 | Redevelopment of K’Maroun Complex in Ijora Lagos State | Ogun Osun River Basin Development Authority | FBC issued on January 12, 2022 | Messrs. Asiko International Energy (Nigeria) Limited | Unsolicited | NGN 890,000,000.0 Eight Hundred and Ninety Million Naira Only | FEC Approval April 6, 2022 | |||
54 | The Development of Deep-Sea Port in Badagry, Lagos.
The project is a Greenfield development designed to cater for containers, dry bulk, liquids, Ro-Ro, oil & gas products, and also operate a free trade and local logistic zones. | Federal Ministry of Transportation/ Nigerian Ports Authority | FBC issued (revalidated) April 25, 2022 | Badagry Port Development Limited. | Solicited | $ 2,777,233,000.00 (Two Billion, Seven Hundred and Seventy-Seven Million Two Hundred and Thirty Three Thousand Dollars. | FEC approval August 3, 2022 concession period 45 years | |||
55 | Development of a Maintenance, Repairs and Overhaul (MRO) Facility The FGN intends to establish an MRO facility for aircraft maintenance, inspections and supply of parts to the aviation sector | Federal Ministry of Aviation | FBC issued August 18, 2022 | AJW Consortium – AJ Walter and Gloresly Pro-Project | Solicited | $ 1.5 Million One Million Five Hundred Thousand Dollars only. | FEC Approval October 12, 2022 | |||
56 | Concession of Planetarium and Museum The project seeks to equip, operate and maintain the Planetarium and Museum at the Obasanjo Space Centre Abuja. | National Space Research & Development Agency (NASRDA) | FBC issued on July 25 2022 | Milky-way Visuals | Solicited | N3,593,532,207.0 Three Billion Five Hundred and Ninety Three Million Five Hundred and Thirty Two Thousand two Hundred and Seven Naira Only. | FEC Approval November 2, 2022 | |||
57 | Research and Development of Satellite Technology and Equipment for the Provision of cost-effective satellite broadband to rural Nigeria | National Space Research & Development Agency (NASRDA) | FBC issued on June 28, 2022 | Messrs Gilat Eleo Technology | Unsolicited | 4,074,371,000.0 Four Million and Seventy-Four Million Three hundred and Seventy-One Thousand Naira Only | FEC Approval November 30, 2022 | |||
58 | Redevelopment of the Nigerian Police DIG Quarters at Maitama District, Abuja, through Public Private Partnership arrangement | Nigeria Police Force | FBC issued | Cosgrove Nigeria | Solicited | 20,138,230,886.0 Twenty-Two Billion One Hundred and Thirty-Eight Million Two hundred and Thirty Thousand and Eighty-Six Naira Only. | FEC Approval November 30, 2022 | |||
59 | Concession of Six hectares of Land in Ikeja Lagos for Mixed Use Development | Federal radio Corporation of Nigeria | FBC Issued on October 24, 2018, Revalidated twice on May 23, 2022 and December 5, 2022 | FishValley Nigeria Ltd | Un Solicited | US$200,000,000.0 | FEC Approved on December 21, 2022 for a 55 -year Concession | |||
60 | Western Offshore Waste Reception Facility (OWREF) Concession under a Design, Finance, Build, Operate, Maintain and Transfer (DFBOMT) under a PPP arrangement. | Nigerian Maritime Administration & Safety Agency (NIMASA) | FBC Issued February 22, 2022 Revalidated December 12, 2022 | African Circle Pollution Waste management LTD | US$ 67,042,013.0 | FEC Approval on December 21, 2022 for a 15 year Concession | ||||
61 | Central Offshore Waste Reception Facility (OWREF) Concession under a Design, Finance, Build, Operate, Maintain and Transfer (DFBOMT) under a PPP arrangement. | Nigerian Maritime Administration & Safety Agency (NIMASA) | FBC Issued February 22, 2022 Revalidated December 12, 2022 | African Circle Pollution Waste management LTD | US$ 66,590,848.0 | FEC Approval on December 21, 2022 for a 15 year Concession | ||||
62 | Eastern Offshore Waste Reception Facility (OWREF) Concession under a Design, Finance, Build, Operate, Maintain and Transfer (DFBOMT) under a PPP arrangement. | Nigerian Maritime Administration & Safety Agency (NIMASA) | FBC Issued February 22, 2022 Revalidated December 12, 2022 | XPO Marine Services LIMITED | US$72,164,699 | FEC approval on December 21, 2022 for a15 year Concession Period | ||||
63 | The Operation of NIMASA Modular Floating Dry Dock | Nigerian Maritime Administration & Safety Agency (NIMASA) | FBC issued on December 15, 2022 | J-Marine Logistics | $19,551,166 (N8,113,733,890). | FEC approval on December 21, 2022 for a15 year Concession Period | ||||
| ||||||||||