Projects Under Custody (Post-Contract)


LIST OF CONCESSION AGREEMENTS UNDER CUSTODY AS OF FEBRUARY 2021

S/NPROJECT DESCRIPTION GOVT AGENCYCONCESSIONAIREDURATIONSTATUS
Ports Infrastructure Sector
LAGOS PORT COMPLEX
1Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)Nigerian Ports Authority (NPA)Apapa Bulk Terminal Ltd “A”

25years

3rd April 2006 – 2nd April 2031

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

To ensure operational efficiency NPA has introduced an Electronic Truck call-up system for all trucks doing business at the Lagos ports. Trucks will be required to park at the approved truck parks until they are called up into the port through the Eto application.

Work on the standard rail line connecting the ports to the hinterland has reached an advance stage.

2

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)

Nigerian Ports Authority (NPA)Apapa Bulk Terminal Ltd “B”

25years

3rd April 2006 – 2nd April 2031

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

To ensure operational efficiency NPA has introduced an Electronic Truck call-up system for all trucks doing business at the Lagos ports. Trucks will be required to park at the approved truck parks until they are called up into the port through the Eto application.

Construction work on the standard rail line connecting the ports to the hinterland has reached an advance stage.

3

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)

Nigerian Ports Authority (NPA)ENL Consortium Ltd (Terminal C)

10 years (Initially)

2006 – 2016

15 years

3rd April 2006 – 2nd April 2021

* Extension of additional 5 years granted to expire in 2021

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

To ensure operational efficiency NPA has introduced an Electronic Truck call-up system for all trucks doing business at the Lagos ports. Trucks will be required to park at the approved truck parks until they are called up into the port through the Eto application.

Construction work on the standard rail line connecting the ports to the hinterland has reached an advance stage.

4

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)

Nigerian Ports Authority (NPA)ENL Consortium Ltd (Terminal D)

10 years (Initially)

2006 – 2016

15 years

3rd April 2006 – 2nd April 2021

* Extension of additional 5 years granted to expire in 2021

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

To ensure operational efficiency NPA has introduced an Electronic Truck call-up system for all trucks doing business at the Lagos ports. Trucks will be required to park at the approved truck parks until they are called up into the port through the Eto application.

Work on the standard rail line connecting the ports to the hinterland has reached an advance stage.

5

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)

Nigerian Ports Authority (NPA)Greenview Development Nigeria Ltd (Terminal E)

25 years

3rd April 2006 – 2nd April 2031

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

To ensure operational efficiency NPA has introduced an Electronic Truck call-up system for all trucks doing business at the Lagos ports. Trucks will be required to park at the approved truck parks until they are called up into the port through the Eto application.

Work on the standard rail line connecting the ports to the hinterland has reached an advance stage.

6

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)

Nigerian Ports Authority (NPA)

APMT Terminals Apapa Ltd

25 years

20th March -19th March 2031

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

To ensure operational efficiency NPA has introduced an Electronic Truck call-up system for all trucks doing business at the Lagos ports. Trucks will be required to park at the approved truck parks until they are called up into the port through the Eto application.

Work on the standard rail line connecting the ports to the hinterland has reached an advance stage.

TIN CAN PORT COMPLEX
7.

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)

Nigerian Ports Authority (NPA)Five Star Logistics Ltd

10 years (Initially)

15 years

10th May 2006- 9th May 2021

* Extension of additional 5yrs granted to expire 2021

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

To ensure operational efficiency NPA has introduced an Electronic Truck call-up system for all trucks doing business at the Lagos ports. Trucks will be required to park at the approved truck parks until they are called up into the port through the Eto application.

Work on the standard rail line connecting the ports to the hinterland has reached an advance stage.

8

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)

 

Nigerian Ports Authority (NPA)Ports and Terminal Multi-Service Ltd

25 years

18th August 2009 -17 August 2034

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

To ensure operational efficiency NPA has introduced an Electronic Truck call-up system for all trucks doing business at the Lagos ports. Trucks will be required to park at the approved truck parks until they are called up into the port through the Eto application.

Work on the standard rail line connecting the ports to the hinterland has reached an advance stage.

9

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)

Nigerian Ports Authority (NPA)Ports and Cargo Handlings Services Ltd

10 years Initially

10th May 2006 – 9th May 2021

15 years

* Extension of additional 5 years granted to expire in 2021

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

To ensure operational efficiency NPA has introduced an Electronic Truck call-up system for all trucks doing business at the Lagos ports. Trucks will be required to park at the approved truck parks until they are called up into the port through the Eto application.

Work on the standard rail line connecting the ports to the hinterland has reached an advance stage.

10

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)

Nigerian Ports Authority (NPA)Tincan Island Container Terminal Ltd (TCIT)

Initially 15

1st June 2006 – 31st May 2026

20 years

* Extension of additional 5 years granted to expire in 2026

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

To ensure operational efficiency NPA has introduced an Electronic Truck call-up system for all trucks doing business at the Lagos ports. Trucks will be required to park at the approved truck parks until they are called up into the port through the Eto application.

Work on the standard rail line connecting the ports to the hinterland has reached an advance stage.

11

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)

Nigerian Ports Authority (NPA)Josepdam Ports Services Nig Ltd

10 years (Initially)

11th May 2006 – 10th May 2021

15 years

*Extension of additional 5yrs granted to expire in 2021

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

To ensure operational efficiency NPA has introduced an Electronic Truck call-up system for all trucks doing business at the Lagos ports. Trucks will be required to park at the approved truck parks until they are called up into the port through the Eto application.

Work on the standard rail line connecting the ports to the hinterland has reached an advance stage.

ONNE PORT COMPLEX
12

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)

Nigerian Ports Authority (NPA)Brawal Oil Services Ltd

25 years

6th August – 5th August 2031

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

13

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)

Nigerian Ports Authority (NPA)West African Container Terminal Ltd (WACT)

25 years

1st September, 2007 -31st August, 2032

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

14

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)

Nigerian Ports Authority (NPA)Intels Nigeria Ltd (Onne- FLT)

25 years

22nd June 2006 – 21st June 2031

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

15

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)

Nigerian Ports Authority (NPA)Intels Nigeria Ltd (Onne – FOT)

25 years

22nd June 2006 – 21st June 2031

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

CALABAR PORT COMPLEX
16

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Calabar)

Nigerian Ports Authority (NPA)Intels Nigeria Ltd (Calabar)

25 years

21 June 2006 - 20th June 2032

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

Traffic of vessels within the Calabar port is gradually improving.

17

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Calabar)

Nigerian Ports Authority (NPA)

Shoreline Logistics Nigeria Ltd

(Addax Logistics Nig Limited)

25 years

26th May 2007 – 25th May 2032

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

Terminal has been reopened for cargos operations, while the passenger services remain suspended.

18

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Calabar)

Nigerian Ports Authority (NPA)Ecomarine (ECM) Terminals Ltd

Initially 25 years

1st August 2007 – 31st July 2037

* Extension of additional 5 years granted to expire in 2037

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

Traffic of vessels within the Calabar port is gradually improving.

DELTA PORT COMPLEX
19

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)

Nigerian Ports Authority (NPA)Intels Nigeria Ltd (Terminal A -Warri)

25 years

21st June 2006 – 22nd June 2031

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

Efforts are being made by the Lessor to attract more businesses to the eastern ports.

20

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)

Nigerian Ports Authority (NPA)Intels Nigeria Ltd (Terminal B -Warri)

25 years

21st June 2006 – 22nd June 2031

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

Efforts are being made by the Lessor to attract more businesses to the eastern ports.

21

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)

Nigerian Ports Authority (NPA)Associated Maritime Services Ltd

Initially 10 years

11th June 2006 -10th June 2021

15 year

* Extension of additional 5 years granted to expire in 2022

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

Efforts are being made by the Lessor to attract more businesses to the eastern ports.

22

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)

Nigerian Ports Authority (NPA)Julius Berger Services Nigeria Ltd

25 years

1st April 2007 – 31 March 2032

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

Efforts are being made by the Lessor to attract more businesses to the eastern ports.

23Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal B Old Port (Warri)Nigerian Ports Authority (NPA)

Ocean & cargo Terminal Services

25 years

22nd February, 2019

21st February, 2044

Under Implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

Efforts are being made by the Lessor to attract more businesses to the eastern ports.

RIVERS PORT COMPLEX
24

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Port Harcourt)

Nigerian Ports Authority (NPA)Port and Terminal Operators Nig Ltd

Initially 15 years

23rd June 2006 -22nd June May 2006 – May 2026

20 years

* Extension of additional 5 years granted to expire in 2026

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

Efforts are being made by the Lessor to attract more businesses to the eastern ports.

25

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Port Harcourt)

Nigerian Ports Authority (NPA)BUA Ports and Terminals Ltd

20 years

9th August 2006 – 8th August 2026

Under implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

Efforts are being made by the Lessor to attract more businesses to the eastern ports.

LEKKI DEEP-WATER PORT COMPLEX
26Development and Operation of Deep-Water Port (Lekki, Lagos)Lekki Port LFTZ Enterprise LimitedThe Nigerian Ports Authority/Lagos State Government45 years (April 21st 2011 – April 20th 2056)

Under Implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

The Concessionaire has forty-eight (48) months from 2nd December 2019 to complete construction work.

As at the end of November 2020, a 38% construction work has been achieved.

Healthcare Infrastructure Sector
27

Concession for the Operation, Management and Provision of Primary, Secondary and Tertiary Health Care at the Garki Hospital Abuja

Federal Capital Territory Administration (FCTA)NISA Premier Hospital Ltd

15 Years from

20th March 2007

To 19th March, 2022

Under Implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

Hospital experienced significant reduction in clinical activities and in-patients’ services during the lockdown, however, there has been significant improvement since the restriction on movement was lifted.

28

Concession for the operation and maintenance of two Warehouses located in Lagos and Abuja, through an Operate and Management contract

(Warehouse in a Box)

Federal Ministry of Health

MDS Logistics Limited

5 years

14th May – 13 May 2024

Under Implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

Operations were affected by the lockdown which came with high delivery cost to client’s location.

Public Building Infrastructure Sector
29

Concession for the Design, Finance, Build, Operate, Maintain and Transfer the Debt Management Office’s Corporate Office Building, Abuja

The Debt Management Office (DMO)LOH & OR Construction Nigeria Limited

30 years from effective date

Contract Signed in 2015

The Commission is monitoring compliance with the terms and conditions of the agreement.

Concessionaire is yet to achieve financial close and fulfill conditions precedent

The Commission is liaising with the Management of DMO on future of the contract

Inland Container Depot Infrastructure Sector
30

Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Abia State)

Nigerian Shippers Council (NSC)Eastgate Inland Container Depot Ltd30 Years from 2007

Implementation is on-going

Concessionaire has reported 5% construction work at the site

31Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Oyo State)Nigerian Shippers Council (NSC)Catamaran Logistics Ltd25 Years from 2007

Implementation is on-going

Concessionaire has reported 10% construction work at the site

32Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Plateau State)Nigerian Shippers Council (NSC)Duncan Maritime Ventures Nigeria Ltd25 Years from 2007

Implementation is on-going

Concessionaire is reported 65% construction work at the site

33Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Kano State)Nigerian Shippers Council (NSC)Dala Inland Dry Port Nigeria Ltd25 Years from 2007

Implementation is On-going

Concessionaire is reported 5% construction work at the site

34Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Katsina State)Nigerian Shippers Council (NSC)Equatorial Marine Oil and Gas Company Ltd25 Years from 2007

Implementation is On-going

Concessionaire is reported 55% construction work at the site

35Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Borno State)Nigerian Shippers Council (NSC)Migfo Nigeria Limited25 Years from 2007

Implementation is On-going

Concessionaire is reported 5% construction work at the site.

Telecommunications (Fibre Optic) Infrastructure Sector
36

Concession Agreement for the Design, Build, Finance, Operate TCN’s Fibre Optic Cable Telecommunications Infrastructure for the Western part of Nigeria

Transmission Company of NigeriaPhase 3 Telecom Ltd

15 Years

March 2006 -2021

Under Implementation

The Commission facilitated a mediation amongst the parties and have resolved all the issues raised by the parties.

37

Concession Agreement for the Design, Build, Finance, Operate TCN’s Fibre Optic Cable Telecommunications Infrastructure for the Eastern part of Nigeria

Transmission Company of NigeriaAlheri Engineering Services L td

15 Years

March 2006 -2021

Under Implementation

The Commission facilitated a mediation amongst the parties and have resolved all the issues raised by the parties.

Aviation Infrastructure Sector
38

Concession to Design, Develop, Finance, Construct, Complete, Test, Commission, Operate, Manage, Maintain and Transfer of the Muritala Muhammed Airport Ikeja – Lagos Domestic Terminal (Lagos)

The Federal Airports Authority of Nigeria (FAAN)Bi -Courtney Ltd

Initially 12 Years

April 24th 2003 – April 23rd 2015
Now 36 years

*Extension granted through an Addendum to the Concession Agreement signed by Parties on 2nd February 2007 for an extension of 36 years

Under Implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

Terminal was re-opened after about three months of suspended operations due to the Covid-19 pandemic

39Concession for the Construction and Development of a Four-Star Hotel at the Muritala Muhammed Airport Ikeja - LagosFederal Ministry of Transportation /Federal Airports Authority of NigeriaBi -Courtney Ltd

40 Years

September 27th 2005

To September 26th 2045

Construction Stalled

Parties are making efforts towards amicable settlement of the dispute

40Concession for the Construction and Development of a Conference Centre at the Muritala Muhammed Airport Ikeja - LagosFederal Airports Authority of NigeriaBi -Courtney Ltd

40 Years

November 21st 2006 – 20th November 2046

Construction Stalled

Parties are making efforts towards amicable settlement of the dispute

41Concession for the Acquisition, Installation, Operation and Management of World Class Integrated System in Designated Airports (MMA –Lagos, Abuja & Kano)The Federal Airports Authority of NigeriaMaevis Nigeria Ltd

10 years

October 2007 – October 2017

Terminated -2012

Terminated

ICRC has been nominated as mediator in the dispute by parties. The mediation process has commenced.

District Engineering Infrastructure Sector
42

Concession for the Development of Engineering Infrastructure for Arterial roads, Storm water drainage network, Sewage network, Electrical distribution network and Telcom duct at the Katampe District, Phase II Federal Capital Territory

(FCT) Abuja

The Federal Capital Development Authority (FCDA)/

Federal Capital Territory Authority (FCTA)

Deanshanger Project Ltd

 5 years

October 2010 – October 2015

Contract Execution Stalled

The FCT inter-ministerial Committee is working to resolve the challenges of executing the contract

Housing Development Infrastructure Sector
43

Concession Agreement for the Reclamation and Infrastructural Development of FESTAC Phase II Housing Development Project –FESTAC Town, Lagos

Federal Ministry of Lands, Housing and Urban Development/The Federal Housing Authority (FHA)New FESTAC Property Development Company Ltd

30 years

8th September 2014 -7th September 2044

Currently stalled as a result of a court case

The Commission liaising with relevant stakeholders towards the resolution of project challenges.

Marine (Security) Infrastructure Sector
44Concession for the Tracking of Ships, Cargoes, Enforce Regulatory Compliance and Surveillance of the Entire Nigeria Maritime Domain – LagosNIMASAMessrs Global West Vessels

10 years

3rd April, 2012

Contract Suspended

The Commission is monitoring compliance with the terms and conditions of the agreement.

The Court has ordered for an out-of-court settlement of the dispute between NIMASA and Global West Vessel Specialist Limited.

Parties are in arbitration to resolve the matter.

Mining (Iron ore) Infrastructure Sector
45Concession for the Rehabilitation, Completion, Management and Operation of the National Iron Ore Mining Company Ltd, including the right to Expand, Prospect, Explore, Excavate, Extract and Sales of the Ore and Products there fromFederal Ministry of Solid Minerals Development/National Iron Ore Mining Company Ltd

Global Infrastructure Nig Ltd/Global Steel Holdings Ltd

First entered into on 17th February, 2005 Following International Settlement, Modified Concession Agreement entered into Commencement Date: 1st August, 2016

Agreement has duration of Seven (7) Years from Effective Date

Contract Suspended

The Commission is monitoring compliance with the terms and conditions of the agreement.

The Commission is liaising with the parties and relevant stakeholders to resolve the challenges

Defence Infrastructure Sector
46

Public Private Partnership and Joint Venture Agreement for the Establishment of a Military Clothing Factory

Kaduna, Kaduna State

Defence Industries Corporation of      Nigeria (DICON)

SUR Corporate Wear Tasarim Dani Manlik GYM SAN VE TIC AS (SUR) Turkey

50 years

24th October 2019 -
23 October 2069

Contract Signed

The Commission is monitoring compliance with the terms and conditions of the agreement.

The Construction work is about 55% completed rate on the proposed 14,500sqm factory building.

47Concession contract for the Design, Finance, Upgrade, Operate and transfer of the Nigerian Correctional Service Shoe and garment Factories at Aba in Abia State and the Leather (Tannery) Factory at Janguza, Kano State, under a Public Private partnership arrangement.Nigerian Correctional Service (NCoS)Erojim Invesment Limited

20 years

13th January 2021-

12th January 2041

Contract Signed

The Commission is monitoring compliance with the terms and conditions of the agreement.

48Concession contract of the integrated digital trunking communications system designed to provide a robust, reliable, secured and independent multimedia communication systems (voice, video and data) for the Nigerian Police Force and other security agencies of government.Federal Ministry of Police AffairsMessrs. MPS Technologies Ltd30 years, with the first 36 months designated for rehabilitation work

Contract Signed

The Commission is monitoring compliance with the terms and conditions of the agreement.

Information Technology and Communication Infrastructure Sector
49

Concession for the Production of ECOWAS Biometric Identity Cards

Federal Ministry of InteriorEuphoria Press Limited

10 years

16th April 2019 –

15 April 2029

Contract Signed

The Commission is monitoring compliance with the terms and conditions of the agreement.

50Concession contract for the Design, Development, and Management of a Secured Ticketing solution for the NRC Rail Services for the Five (5) stations along NRC rail Corridor between Abuja and Kaduna.Nigerian Railway Corporation (NRC)SecureID Limited

10 years

18th November, 2020 - 17th November, 2020, subject to any future amendment on the contract term

Contract Signed

The Commission is monitoring compliance with the terms and conditions of the agreement.

Electricity (Hydro & Solar) Infrastructure Sector
51

Concession Agreements for the Operation, Maintenance, Design and Sales of electricity produce – Niger State

Kainji Hydro Electricity PlcMainstream Energy Solutions Ltd

30 Years

21st February 2013 –

20th February 2043

Under Implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

52Concession Agreements for the Operation, Maintenance, Design and Sales of electricity produce – Niger StateShiroro Hydro Electric PlcNorth South Power Company Ltd

30 Years

21st February 2013 –

20th February 2043

Under Implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

53Concession for the Design, Construct, Install, Operate and Maintain the Dadin Kowa Hydro Dam for the purpose of Electricity Generation with a capacity of 39 MW – Gombe StateFederal Ministry of Water ResourcesMabon Limited

25 years from 4th July, 2005

Addendum to the agreement signed on 4th August, 2016

Commencement from Effective Date: Upon Reaching Financial Close

Under Implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

54Concession of Gurara Hydro Power Project Kaduna Operate and Maintain PPP project (30 Mega Watts)Federal Ministry of Water Resources

North South Power Company Limited

25 years from commencement date

Contract Signed; 12th May, 2020

Under Implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

55

Concession for the Service Management of Gurara Phase 1 Multipurpose Dam Facilities

Federal Ministry of Water Resources

Messrs Gams and Abell Ltd, in Conjunction with Ryzyn Global Inc USA

10 years

30th December 2019 – 29th December 2029

Under Implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

56Concession of Rooftop solar Power,750 kilowatts (KW) solar power system for Federal Ministry of Power, Works and Housing (Power House) building in AbujaFederal Ministry of Power, Works and Housing (Power Sector)

Proserve Energy Ltd

10 years

14th March 2019 – 13th March 2029

Under Implementation

The Commission is monitoring compliance with the terms and conditions of the agreement.

Agriculture (Silos- Storage) Infrastructure Sector
57Concession of Grain Storage Facilities for food storage (Silos) in Ado EkitiFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

58Concession of Grain Storage Facilities for food storage (Silos) in AkureFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

59Concession of Grain Storage Facilities for food storage (Silos) in GayaFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

60Concession of Grain Storage Facilities for food storage (Silos) in IkenneFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

61Concession of Grain Storage Facilities for food storage (Silos) in JosFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

62Concession of Grain Storage Facilities for food storage (Silos) in OgojaFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

63Concession of Grain Storage Facilities for food storage (Silos) in SokotoFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

64Concession of Grain Storage Facilities for food storage (Silos) inIgbariamFederal Ministry of Agriculture and Rural Development

Coscharis Farms Limited

 

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

65Concession of Grain Storage Facilities for food storage (Silos) inEzilloFederal Ministry of Agriculture and Rural Development

Ebony Agro Industries Ltd

 

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

66Concession of Grain Storage Facilities for food storage (Silos) inIbadanFederal Ministry of Agriculture and Rural Development

Independent Ltd

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

67Concession of Grain Storage Facilities for food storage (Silos) inBulasaFederal Ministry of Agriculture and Rural Development

Matrixville Consortium Ltd

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

68Concession of Grain Storage Facilities for food storage (Silos) in JahunFederal Ministry of Agriculture and Rural Development

Matrixville Consortium Ltd

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

69Concession of Grain Storage Facilities for food storage (Silos) in KadunaFederal Ministry of Agriculture and Rural Development

Matrixville Consortium Ltd

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

70Concession of Grain Storage Facilities for food storage (Silos) in Kwali,Federal Ministry of Agriculture and Rural Development

Matrixville Consortium Ltd

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

71Concession of Grain Storage Facilities for food storage (Silos) in Lafiagi,Federal Ministry of Agriculture and Rural Development

Matrixville Consortium Ltd

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

72Concession of Grain Storage Facilities for food storage (Silos) in UyoFederal Ministry of Agriculture and Rural Development

Neon Farms Ltd

 

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

73Concession of Grain Storage Facilities for food storage (Silos) in GombeFederal Ministry of Agriculture and Rural DevelopmentServewell Agricultural Services Limited

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

74Concession of Grain Storage Facilities for food storage (Silos) in MakurdiFederal Ministry of Agriculture and Rural Development

Upland Grains Ltd

 

10 Years

2018 - 2028

Under Implementation

The Ministry has officially handed over the facility to the Concessionaire and is planning an inception monitoring visit to the Silo complex.

LIST OF PUBLIC PRIVATE PARTERNISHIP CONTRACTS UNDER CUSTODY – SEPTEMBER, 2020

S/NPROJECTGOVT AGENCYCONCESSIONAIREDURATIONSTATUS 
Ports Infrastructure Sector
LAGOS PORT COMPLEX
1

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)

Nigerian Ports Authority (NPA)Apapa Bulk Terminal Ltd “A”

25years

3rd April 2006 –

2nd April 2031

Under implementation.

The Commission is providing regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Access roads are undergoing rehabilitation.

 
2

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)

Nigerian Ports Authority (NPA)Apapa Bulk Terminal Ltd “B”

25years

3rd April 2006 –

2nd April 2031

Under implementation.

The Commission is providing regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Access roads are undergoing rehabilitation.

 
3

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)

Nigerian Ports Authority (NPA)ENL Consortium Ltd (Terminal C)

10 years Initially

2006 – 2016

15 years

3rd April 2006 –

2nd April 2021

Extension of additional 5 years granted to expire in 2021

Under implementation.

The Commission is providing regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Access roads are undergoing rehabilitation.

 
4

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)

Nigerian Ports Authority (NPA)ENL Consortium Ltd (Terminal D)

10 years Initially

2006 – 2016

15 years

3rd April 2006 –

2nd April 2021

Extension of additional 5 years granted to expire in 2021

Under implementation.

The Commission is providing regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Access roads are undergoing rehabilitation.

 
5

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)

Nigerian Ports Authority (NPA)Greenview Development Nigeria Ltd (Terminal E)

25 years

3rd April 2006 –

2nd April 2031

Under implementation.

The Commission is providing regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Access roads are undergoing rehabilitation.

 
6

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)

Nigerian Ports Authority (NPA)

APMT Terminals Apapa Ltd

25 years

20th March –

19th March 2031

Under implementation.

The Commission is providing regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Access roads are undergoing rehabilitation.

 
TIN CAN PORT COMPLEX
7

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)

Nigerian Ports Authority (NPA)Five Star Logistics Ltd

10 years Initially

15 years

10th May 2006-

9th May 2021

* Extension of additional 5yrs granted to expire 2021

Under implementation.

The Commission is providing regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Access roads are undergoing rehabilitation.

 
8

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)

 

Nigerian Ports Authority (NPA)Ports and Terminal Multi-Service Ltd

25 years

18th August 2009 –

17th August 2034

Under implementation.

The Commission is providing regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Access roads are undergoing rehabilitation.

 
9

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)

Nigerian Ports Authority (NPA)Ports and Cargo Handlings Services Ltd

10 years Initially

10th May 2006 –

9th May 2021

15 years

Extension of additional 5 years granted to expire in 2021

Under implementation.

The Commission is providing regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Access roads are undergoing rehabilitation.

 
10

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)

Nigerian Ports Authority (NPA)Tincan Island Container Terminal Ltd (TCIT)

15 years Initially

1st June 2006 –

31st May 2026

20 years

Extension of additional 5 years granted to expire in 2026

Under implementation.

The Commission is providing regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Access roads are undergoing rehabilitation.

 
11

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)

Nigerian Ports Authority (NPA)Josepdam Ports Services Nig Ltd

10 years Initially

11th May 2006 –

10th May 2021

15 years

*Extension of additional 5yrs granted to expire in 2021

Under implementation.

The Commission is providing regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Access roads are undergoing rehabilitation.

 
ONNE PORT COMPLEX
12

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)

Nigerian Ports Authority (NPA)Brawal Oil Services Ltd

25 years

6th August 2006 –

5th August 2031

Under implementation.

The Commission is providing regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Improvement has been recorded on Security of the water channel, electricity supply and cargo traffic in the eastern ports.

 
13

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)

Nigerian Ports Authority (NPA)West African Container Terminal Ltd (WACT)

25 years

1st September, 2007-31st August, 2032

Under implementation.

The Commission is providing Regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Improvement has been recorded on Security of the water channel, electricity supply and cargo traffic in the eastern ports.

 
14

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)

Nigerian Ports Authority (NPA)Intels Nigeria Ltd (Onne- FLT)

25 years

22nd June 2006 –

21st June 2031

Under implementation.

The Commission is providing Regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Improvement has been recorded on Security of the water channel, electricity supply and cargo traffic in the eastern ports.

 
15

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)

Nigerian Ports Authority (NPA)Intels Nigeria Ltd (Onne – FOT)

25 years

22nd June 2006 –

21st June 2031

Under implementation.

The Commission is providing Regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Improvement has been recorded on Security of the water channel, electricity supply and cargo traffic in the eastern ports.

 
CALABAR PORT COMPLEX
16

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Calabar)

Nigerian Ports Authority (NPA)Intels Nigeria Ltd (Calabar)

25 years

21st June 2006 –

20th June 2031

Under implementation.

The Commission is providing Regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Improvement has been recorded on Security of the water channel, electricity supply and cargo traffic in the eastern ports.

 
17

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Calabar)

Nigerian Ports Authority (NPA)

Shoreline Logistics Nigeria Ltd

(Addax Logistics Nig Limited)

25 years

26th May 2007 –

25th May 2032

Under implementation.

The Commission is providing Regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

§  The terminal was closed due to the closure of land borders

§  The terminal’s Passenger operation services have been Suspended. due to border closure.

 
18

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Calabar)

Nigerian Ports Authority (NPA)Ecomarine (ECM) Terminals Ltd

Initially 25 years

1st August 2007 –

31st July 2037

30 years

Extension of additional 5 years granted to expire in 2037

Under implementation.

The Commission is providing Regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Improvement has been recorded on Security of the water channel, electricity supply and cargo traffic in the eastern ports.

 
DELTA PORT COMPLEX
19

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)

Nigerian Ports Authority (NPA)Intels Nigeria Ltd (Terminal A -Warri)

25 years

21st June 2006 –

20th June 2031

Under implementation.

The Commission is providing Regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Improvement has been recorded on Security of the water channel, electricity supply and cargo traffic in the eastern ports.

Warri port channel dredging by NPA has enhanced medium size vessels to berth at the terminals.

 
20

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)

Nigerian Ports Authority (NPA)Intels Nigeria Ltd (Terminal B -Warri)

25 years

21st June 2006 –

20th June 2031

Under implementation.

The Commission is providing Regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Improvement has been recorded on Security of the water channel, electricity supply and cargo traffic in the eastern ports.

Warri port channel dredging by NPA has enhanced medium size vessels to berth at the terminals.

 
21

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)

Nigerian Ports Authority (NPA)Associated Maritime Services Ltd

Initially 10 years

11th June 2006 –

10th June 2021

15 year

Extension of additional 5 years granted to expire in 2021

Under implementation.

The Commission is providing Regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Improvement has been recorded on Security of the water channel, electricity supply and cargo traffic in the eastern ports.

Warri port channel has been dredged by NPA to allow medium size vessels to berth at the terminals.

 
22

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)

Nigerian Ports Authority (NPA)Julius Berger Services Nigeria Ltd

25 years

1st April 2007 –

31st March 2032

Under implementation.

The Commission is providing Regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Improvement has been recorded on Security of the water channel, electricity supply and cargo traffic in the eastern ports.

Warri port channel has been dredged by NPA to allow medium size vessels to berth at the terminals.

 
23Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal B Old Port (Warri)Nigerian Ports Authority (NPA)

Ocean & cargo Terminal Services

25 years

22nd February 2019 –

21st February 2044

Under implementation.

Terminal has is yet to commence operations though investment have been made in infrastructure and equipment acquisition Offices Spaces have been put in place for administration and Government Agencies,

Dredging of the channel for deeper depth of water is affected due to NNPC pipelines.

 
RIVERS PORT COMPLEX
24

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Port Harcourt)

Nigerian Ports Authority (NPA)Port and Terminal Operators Nig Ltd

Initially 15 years

23rd June 2006 –

22nd June 2026

20 years

Extension of additional 5 years granted to expire in 2026

Under implementation.

The Commission is providing Regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Improvement has been recorded on Security of the water channel, electricity supply and cargo traffic in the eastern ports.

 
25

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Port Harcourt)

Nigerian Ports Authority (NPA)BUA Ports and Terminals Ltd

20 years

9th August 2006 –

8th August 2026

Under implementation.

The Commission is providing Regulatory services to the Parties on the review of the Port Contracts and ways to improve Terminal operations.

Improvement has been recorded on Security of the water channel, electricity supply and cargo traffic in the eastern ports.

 
LEKKI DEEP-WATER PORT COMPLEX
26Development and Operation of Deep-Water Port (Lekki, Lagos)Lekki Port LFTZ Enterprise LimitedThe Nigerian Ports Authority/Lagos State Government

45 years

21st April 2011 –

20thApril 2056

Under implementation.

§  The Concession has attained financial close following the signing of $629million financing agreement for the project by the Chinese Development Bank

§  Construction work is ongoing at the project site

 
HEALTHCARE INFRASTRUCTURE SECTOR
27

Concession for the Operation, Management and Provision of Primary, Secondary and Tertiary Health Care at the Garki Hospital Abuja

Federal Capital Territory Administration (FCTA)NISA Premier Hospital Ltd

15 Years from

20th March 2007-

19th March, 2022

Under implementation.

The Operator reported on the significant milestones of medical services achieved in the Hospital.

The hospital remained opened to patients with uninterrupted service delivery during lockdown period due to the Covid-19 Pandemic.

 
28

Concession for the operation and maintenance of two Warehouses located in Lagos and Abuja, through an Operate and Management contract

(Warehouse in a Box)

Federal Ministry of Health

MDS Logistics Limited

5 years

14th May 2019–

13th May 2024

Under implementation.

Material handling equipment deployed to Abuja and Lagos Federal Warehouses

The implementation has commenced and short-term challenges are being resolved.

 
PUBLIC BUILDING INFRASTRUCTURE SECTOR
29

Concession for the Design, Finance, Build, Operate, Maintain and Transfer the Debt Management Office’s Corporate Office Building, Abuja

The Debt Management Office (DMO)LOH & OR Construction Nigeria Limited

30 years from effective date

2015 – 2045

Concessionaire is yet to achieve financial close and fulfill conditions precedent.

The Commission is liaising with the Management of DMO on future of the contract

 

30

 

Concession for the Lease of real property, Purchase of moveable Assets, Improvements to leased Property and Performance of Operations and Maintenance of the Building Complex/Trade Centre (Lagos) Tafawa Balewa Square (TBS):Tafawa Balewa Square Management BoardBHS International Limited

30 years

17th October 2007 –

16th October 2037

Contract Terminated.

Parties are in court over the termination of the contract and the Commission is engaging the parties and relevant stakeholders on the matter.

 
31

Building Complex/Trade Centre– Finance, Maintain and Development Contract (Lagos)

Lagos International Trade Fair Complex (LITFC): 322 Hectares landed Property

Lagos International Trade Fair Management BoardAulic Nigeria Limited

30 years

29th June 2007 –
28th June 2037

Contract Terminated.

Parties are in court over the termination of the contract and the Commission is engaging the parties and relevant stakeholders on the matter.

 
INLAND CONTAINER DEPOT INFRASTRUCTURE SECTOR
32

Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Abia State)

Nigerian Shippers Council (NSC)Eastgate Inland Container Depot Ltd30 Years from 2007

Implementation is ongoing.

Concessionaire has reported 5% construction work at the site.

 
33Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Oyo State)Nigerian Shippers Council (NSC)Catamaran Logistics Ltd25 Years from 2007

Implementation is ongoing.

Concessionaire has reported 10% construction work at the site.

 
34Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Plateau State)Nigerian Shippers Council (NSC)Duncan Maritime Ventures Nigeria Ltd25 Years from 2007

Implementation is ongoing.

Concessionaire has reported 65% construction work at the site.

 
35Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Kano State)Nigerian Shippers Council (NSC)Dala Inland Dry Port Nigeria Ltd25 Years from 2007

Implementation is ongoing.

Concessionaire has reported 5% construction work at the site.

 
36Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Katsina State)Nigerian Shippers Council (NSC)Equatorial Marine Oil and Gas Company Ltd25 Years from 2007

Implementation is ongoing.

Concessionaire has reported 55% construction work at the site.

 
37Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Borno State)Nigerian Shippers Council (NSC)Migfo Nigeria Limited25 Years from 2007

Implementation is ongoing.

Concessionaire has reported 5% construction work at the site.

 
Telecommunications (Fibre Optic) Infrastructure Sector
38

Concession Agreement for the Design, Build, Finance, Operate TCN’s Fibre Optic Cable Telecommunications Infrastructure for the Western part of Nigeria

Transmission Company of Nigeria (TCN)Phase 3 Telecom Ltd

15 Years

20th March 2006 –
19th March 2021

Under implementation.

TCN and Phase 3 are mediating to resolve the contract challenges.

TCN has given access to Phase 3 Engineering Company to resume operations at the sub stations.

The Commission is facilitating the mediation process between the parties.

 
39

Concession Agreement for the Design, Build, Finance, Operate TCN’s Fibre Optic Cable Telecommunications Infrastructure for the Eastern part of Nigeria

Transmission Company of Nigeria (TCN)Alheri Engineering Services L td

15 Years

20th March 2006 –
19th March 2021

Under implementation.

TCN and Alheri are mediating to resolve the contract challenges.

TCN has given access to Alheri Engineering Services to resume operations at the sub stations.

The Commission is facilitating the mediation process between the parties.

 
AVIATION INFRASTRUCTURE SECTOR
40

Concession to Design, Develop, Finance, Construct, Complete, Test, Commission, Operate, Manage, Maintain and Transfer of the Muritala Muhammed Airport Ikeja – Lagos Domestic Terminal (Lagos)

The Federal Airports Authority of Nigeria (FAAN)Bi -Courtney Ltd

Initially 12 Years

April 24th 2003 – April 23rd 2015
Now 36 years

*Extension granted through an Addendum to the Concession Agreement signed by Parties on 2nd February 2007 for an extension of 36 years

Under implementation. though faced with challenges.

Terminal was re-opened after four months of Suspended. operations due to the Covid-19 pandemic.

Parties are making efforts towards amicable settlement of the challenges

 
41Concession for the Construction and Development of a Four-Star Hotel at the Muritala Muhammed Airport Ikeja – LagosFederal Ministry of Transportation /Federal Airports Authority of NigeriaBi -Courtney Ltd

40 Years

27th September  2005-26th September  2045

Construction stalled.

Parties are making efforts towards amicable settlement of the dispute.

 
42Concession for the Construction and Development of a Conference Centre at the Muritala Muhammed Airport Ikeja – LagosFederal Airports Authority of NigeriaBi -Courtney Ltd

40 Years

21st November 2006 – 20th November 2046

Construction stalled.

Parties are making efforts towards amicable settlement of the dispute.

 
43Concession for the Acquisition, Installation, Operation and Management of World Class Integrated System in Designated Airports (MMA –Lagos, Abuja & Kano)The Federal Airports Authority of NigeriaMaevis Nigeria Ltd

10 years

31st October 2007 – 30th October 2017

Terminated -24th March 2012

Terminated.

ICRC has been nominated as mediator in the dispute by parties.

 
DISTRICT ENGINEERING INFRASTRUCTURE SECTOR
44

Concession for the Development of Engineering Infrastructure for Arterial roads, Storm water drainage network, Sewage network, Electrical distribution network and Telcom duct at the Katampe District, Phase II Federal Capital Territory

(FCT) Abuja

The Federal Capital Development Authority (FCDA)/

Federal Capital Territory Authority (FCTA)

Deanshanger Project Ltd

 5 years

19thOctober 2010 – 18th October 2015

Contract Execution stalled.

The FCT inter-ministerial Committee is working to resolve the challenges of executing the contract.

 
HOUSING DEVELOPMENT INFRASTRUCTURE SECTOR
45Concession Agreement for the Reclamation and Infrastructural Development of FESTAC Phase II Housing Development Project –FESTAC Town, LagosFederal Ministry of Lands, Housing and Urban Development/The Federal Housing Authority (FHA)New FESTAC Property Development Company Ltd

30 years

8th September 2014 -7th September 2044

Currently stalled as a result of a court case.

The Commission is discussing with the parties on ways of resolving the land ownership dispute with the local community

 
MARINE (SECURITY) INFRASTRUCTURE SECTOR
46

Concession for the Provision of Security, Monitoring and Enforcement Operational Platforms –

Tracking of Ships, Cargoes, Enforce Regulatory Compliance and Surveillance of the Entire Nigeria Maritime Domain – Lagos

NIMASAMessrs Global West Vessels

10 years

3rd April 2012 –

2nd April 2022

Suspended.

Commission is liaising with relevant agencies of Government to chart a way forward concerning the project.

 
MINING (IRON ORE) INFRASTRUCTURE SECTOR
47Concession for the Rehabilitation, Completion, Management and Operation of the National Iron Ore Mining Company Ltd, including the right to Expand, Prospect, Explore, Excavate, Extract and Sales of the Ore and Products there fromFederal Ministry of Solid Minerals Development/National Iron Ore Mining Company Ltd

Global Infrastructure Nig Ltd/Global steel Holdings Ltd

First entered into on 17th February, 2005 Following International Settlement, Modified Concession Agreement entered into Commencement Date: 1st August, 2016

Agreement has duration of Seven (7) Years from Effective Date

Suspended.

The Commission is liaising with the parties and relevant stakeholders to resolve the challenges.

 
DEFENCE (MILITARY CLOTHING) INFRASTRUCTURE SECTOR
48Public Private Partnership and Joint Venture Agreement for the Establishment of a Military Clothing Factory Kaduna State

Defence Industries Corporation of      Nigeria (DICON)

SUR Corporate Wear Tasarim Dani Manlik GYM SAN VE TIC AS (SUR) Turkey

50 years

24th October 2019 –
23rd October 2069

Contract signed.

The project is under construction.

 
INFORMATION TECHNOLOGY AND COMMUNICATION INFRASTRUCTURE SECTOR
49

Concession for the Production of ECOWAS Biometric Identity Cards

Federal Ministry of InteriorEuphoria Press Limited

10 years

16th April 2019 –

15th April 2029

Contract signed.

Commission has taken custody of the contract and commences monitoring the efficient execution of contractual terms and conditions.

 
ELECTRICITY (HYDRO & SOLAR) INFRASTRUCTURE SECTOR
50

Concession Agreements for the Operation, Maintenance, Design and Sales of electricity produce – Niger State

Kainji Hydro Electricity PlcMainstream Energy Solutions Ltd

30 Years

21st February 2013 –

20th February 2043

Under implementation.

The Concessionaire has reported a progressive and steady power generation at the station.

 
51Concession Agreements for the Operation, Maintenance, Design and Sales of electricity produce – Niger StateShiroro Hydro Electric PlcNorth South Power Company Ltd

30 Years

21st February 2013 –

20th February 2043

Under implementation.

The Concessionaire has reported power generation of 450mw since March, 2020, One Unit which generates 150mw has been shut down for overhauling and maintenance repairs.

 
52Concession for the Design, Construct, Install, Operate and Maintain the Dadin Kowa Hyro Dam for the purpose of Electricity Generation with a capacity of 39 MW – Gombe StateFederal Ministry of Water ResourcesMabon Limited

25 years

Contract signed Initially on 4th July 2005

Addendum to the Agreement signed on 4th August, 2016

Contract will commence upon the granting of the Power Purchase Agreement (PPA) and Water License

Under implementation.

Commission is liaising with parties to fast track the Power Purchase Agreement and Water License to commence the execution of project.

 
53Concession of Gurara Hydro Power Project Kaduna Operate and Maintain PPP project (30 Mega Watts)Federal Ministry of Water ResourcesNorth South Power Company Limited

25 years from commencement date

12th May 2020 –

11th May 2045

Under implementation.

Concessionaire has moved to site and the process of rehabilitation of 3 units of 10 megawatts has commenced.

 
54

Concession for the Service Management of Gurara Phase 1 Multipurpose Dam Facilities

Federal Ministry of Water Resources

Messrs Gams and Abell Ltd, in Conjunction with Ryzyn Global Inc USA

10 years

30th December 2019 – 29th December 2029

Under implementation.

The Commission has taken custody of the Concession contract and commenced the process of monitoring Parties Compliance.

 
55Concession of Rooftop solar Power,750 kilowatts (KW) solar power system for Federal Ministry of Power, Works and Housing (Power House) building in AbujaFederal Ministry of Power, Works and Housing (Power Sector)

Proserve Energy Ltd

10 years

14th March 2019 – 13th March 2029

Under implementation.

Concessionaire seeking to attain financial close.

 
AGRICULTURE (SILOS- STORAGE) INFRASTRUCTURE SECTOR
56Concession of Grain Storage Facilities for food storage (Silos) in Ado EkitiFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.

 
57Concession of Grain Storage Facilities for food storage (Silos) in AkureFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.

 
58Concession of Grain Storage Facilities for food storage (Silos) in GayaFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.

 
59Concession of Grain Storage Facilities for food storage (Silos) in IkenneFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.

 
60Concession of Grain Storage Facilities for food storage (Silos) in JosFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.

 
61Concession of Grain Storage Facilities for food storage (Silos) in OgojaFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.

 
62Concession of Grain Storage Facilities for food storage (Silos) in SokotoFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.

 
63Concession of Grain Storage Facilities for food storage (Silos) inIgbariamFederal Ministry of Agriculture and Rural DevelopmentCoscharis Farms Limited

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.

 
64Concession of Grain Storage Facilities for food storage (Silos) in EzilloFederal Ministry of Agriculture and Rural Development

Ebony Agro Industries Ltd

 

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.

 
65Concession of Grain Storage Facilities for food storage (Silos) in IbadanFederal Ministry of Agriculture and Rural Development

Independent Ltd

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.

 
66Concession of Grain Storage Facilities for food storage (Silos) in BulasaFederal Ministry of Agriculture and Rural DevelopmentMatrixville Consortium Ltd

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.

 
67Concession of Grain Storage Facilities for food storage (Silos) in JahunFederal Ministry of Agriculture and Rural Development

Matrixville Consortium Ltd

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.

 
68Concession of Grain Storage Facilities for food storage (Silos) in KadunaFederal Ministry of Agriculture and Rural Development

Matrixville Consortium Ltd

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.

 
69Concession of Grain Storage Facilities for food storage (Silos) in Kwali,Federal Ministry of Agriculture and Rural Development

Matrixville Consortium Ltd

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.

 
70Concession of Grain Storage Facilities for food storage (Silos) in Lafiagi,Federal Ministry of Agriculture and Rural Development

Matrixville Consortium Ltd

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.

 
71Concession of Grain Storage Facilities for food storage (Silos) in UyoFederal Ministry of Agriculture and Rural DevelopmentNeon Farms Ltd

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.

 
72Concession of Grain Storage Facilities for food storage (Silos) in GombeFederal Ministry of Agriculture and Rural DevelopmentServewell Agricultural Services Limited

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.

 
73Concession of Grain Storage Facilities for food storage (Silos) in MakurdiFederal Ministry of Agriculture and Rural Development

Upland Grains Ltd

 

10 Years

2018 – 2028

Under implementation.

The Ministry is to officially hand the facility to the Operator.