Projects Under Custody (Post-Contract)
LIST OF CONCESSION AGREEMENTS UNDER CUSTODY – MAY 2022
S/N | PROJECT DESCRIPTION | GOVT AGENCY | CONCESSIONAIRE | DURATION | STATUS |
Ports Infrastructure Sector | |||||
LAGOS PORT COMPLEX | |||||
1 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)
| Nigerian Ports Authority (NPA) | Apapa Bulk Terminal Ltd “A” | 25years 3rd April 2006 – 2nd April 2031 | Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
Railway construction work is at completion stage and would be an added evacuation option to transport goods out of the western port complex.
|
2 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)
| Nigerian Ports Authority (NPA) | Apapa Bulk Terminal Ltd “B” | 25years 3rd April 2006 – 2nd April 2031 | Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
Railway construction work is at completion stage and would be an added evacuation option to transport goods out of the western port complex.
|
3 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)
| Nigerian Ports Authority (NPA) | ENL Consortium Ltd (Terminal C) | 10 years (Initially) 2006 – 2016 15 years 3rd April 2006 – 2nd April 2021
* Extension of additional 5 years granted to expire in 2021 | Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
Railway construction work is at completion stage and would be an added evacuation option to transport goods out of the western port complex.
The Commission is engaging the Parties and other stakeholders on the contract expiration. |
4 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)
| Nigerian Ports Authority (NPA) | ENL Consortium Ltd (Terminal D) | 10 years (Initially) 2006 – 2016 15 years 3rd April 2006 – 2nd April 2021
* Extension of additional 5 years granted to expire in 2021 | Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
Railway construction work connecting the port to evacuate goods is at completion stage.
The Commission is engaging the Parties and other stakeholders on the contract expiration. |
5 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)
| Nigerian Ports Authority (NPA) | Greenview Development Nigeria Ltd (Terminal E) | 25 years 3rd April 2006 – 2nd April 2031
| Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
Railway construction work connecting the port to evacuate goods is at completion stage.
|
6 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)
| Nigerian Ports Authority (NPA) | APMT Terminals Apapa Ltd
| 25 years 20th March -19th March 2031
| Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
Railway construction work connecting the port to evacuate goods is at completion stage.
|
TIN CAN PORT COMPLEX | |||||
7. | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)
| Nigerian Ports Authority (NPA) | Five Star Logistics Ltd | 15 years (Initially) 10th May 2006- 2nd May 2021
* Extension of additional 5yrs granted to expire 2nd May 2026 | Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
Access road to Tincan Island Port is under re-construction.
|
8 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)
| Nigerian Ports Authority (NPA) | Ports and Terminal Multi-Service Ltd | 25 years 18th August 2009 -17 August 2034 | Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
Access road to Tincan Island Port is under re-construction.
|
9 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)
| Nigerian Ports Authority (NPA) | Ports and Cargo Handlings Services Ltd | 10 years Initially 10th May 2006 – 9th May 2021 15 years
* Extension of additional 5 years granted to expire in 2021 | Under implementation
Access road to Tincan Island Port is under re-construction.
The Commission is engaging the Parties, Federal Ministry of Transportation and stakeholders on the contract expiration.
|
10 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)
| Nigerian Ports Authority (NPA) | Tincan Island Container Terminal Ltd (TCIT) | Initially 15 1st June 2006 – 31st May 2026 20 years
* Extension of additional 5 years granted to expire in 2026 | Under implementation
Access road to Tincan Island Port is under re-construction.
|
11 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)
| Nigerian Ports Authority (NPA) | Josepdam Ports Services Nig Ltd | 10 years (Initially) 11th May 2006 – 10th May 2021 15 years
*Extension of additional 5yrs granted to expire in 2021 | Under implementation
Access road to Tincan Island Port is under re-construction.
The Commission is engaging the Parties, Federal Ministry of Transportation and stakeholders on the contract expiration. |
ONNE PORT COMPLEX | |||||
12 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)
| Nigerian Ports Authority (NPA) | Brawal Oil Services Ltd | 25 years 6th August – 5th August 2031 | Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
|
13 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)
| Nigerian Ports Authority (NPA) | West African Container Terminal Ltd (WACT) | 25 years 1st September, 2007 -31st August, 2032 | Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
|
14 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)
| Nigerian Ports Authority (NPA) | Intels Nigeria Ltd (Onne- FLT) | 25 years 22nd June 2006 – 21st June 2031 | Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
|
15 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)
| Nigerian Ports Authority (NPA) | Intels Nigeria Ltd (Onne – FOT) | 25 years 22nd June 2006 – 21st June 2031 | Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
|
CALABAR PORT COMPLEX | |||||
16 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Calabar)
| Nigerian Ports Authority (NPA) | Intels Nigeria Ltd (Calabar) | 25 years 21 June 2006 - 20th June 2032 | Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
Demobilization of the Delta Queen Rig is on-going.
|
17 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Calabar)
| Nigerian Ports Authority (NPA) | Shoreline Logistics Nigeria Ltd (Addax Logistics Nig Limited) | 25 years 26th May 2007 – 25th May 2032 | Under implementation
The reconstruction of the collapsed berth at the Terminal is about to commence.
|
18 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Calabar)
| Nigerian Ports Authority (NPA) | Ecomarine (ECM) Terminals Ltd | Initially 25 years 1st August 2007 – 31st July 2037
* Extension of additional 5 years granted to expire in 2037 | Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
|
DELTA PORT COMPLEX | |||||
19 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)
| Nigerian Ports Authority (NPA) | Intels Nigeria Ltd (Terminal A -Warri) | 25 years 21st June 2006 – 22nd June 2031 | Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
Port Access roads are undergoing re-construction. |
20 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)
| Nigerian Ports Authority (NPA) | Intels Nigeria Ltd (Terminal B -Warri) | 25 years 21st June 2006 – 22nd June 2031 | Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
Port Access roads are undergoing re-construction.
|
21 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)
| Nigerian Ports Authority (NPA) | Associated Maritime Services Ltd | Initially 10 years 11th June 2006 -10th June 2021 15 years.
* Extension of additional 5 years granted to expire in 2022 | Under implementation
The Commission is engaging the Parties, Federal Ministry of Transportation and stakeholders on the contract expiration.
Port Access roads are undergoing re-construction. |
22 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)
| Nigerian Ports Authority (NPA) | Julius Berger Services Nigeria Ltd | 25 years 1st April 2007 – 31 March 2032 | Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
Port Access roads are undergoing re-construction. |
23 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal B Old Port (Warri) | Nigerian Ports Authority (NPA) | Ocean & cargo Terminal Services
| 25 years 22nd February, 2019 21st February, 2044
| Under Implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
Port Access roads are undergoing rehabilitation.
|
RIVERS PORT COMPLEX | |||||
24 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Port Harcourt)
| Nigerian Ports Authority (NPA) | Port and Terminal Operators Nig Ltd | Initially 15 years 23rd June 2006 -22nd June May 2006 – May 2026 20 years
* Extension of additional 5 years granted to expire in 2026 | Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
|
25 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Port Harcourt)
| Nigerian Ports Authority (NPA) | BUA Ports and Terminals Ltd | 20 years 9th August 2006 – 8th August 2026 | Under implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
|
Lekki Deep-Water Port Complex
| |||||
26 | Development and Operation of Deep-Water Port (Lekki, Lagos) | Lekki Port LFTZ Enterprise Limited | The Nigerian Ports Authority/Lagos State Government | 45 years (April 21st 2011 – April 20th 2056) | Under Implementation
The Commission is monitoring compliance with the terms and conditions of the agreement.
Eastern Breakwater core dumping is ongoing.
Production of tubular steel piles ongoing in the Pile Fabrication yard.
|
Healthcare Infrastructure Sector
| |||||
27 | Concession for the Operation, Management and Provision of Primary, Secondary and Tertiary Health Care at the Garki Hospital Abuja
| Federal Capital Territory Administration (FCTA) | NISA Premier Hospital Ltd | 15 Years from 20th March 2007 To 19th March, 2022 | Under Implementation
The Commission is engaging the FCTA Health Secretariat on the expiration of the Contract.
|
28 | Concession for the operation and maintenance of two Warehouses located in Lagos and Abuja, through an Operate and Management contract (Warehouse in a Box) | Federal Ministry of Health | MDS Logistics Limited
| 5 years 14th May – 13 May 2024 | Under Implementation
The two facilities in Lagos and Abuja are fully operational.
|
Public Building Infrastructure Sector
| |||||
29 | Concession for the Design, Finance, Build, Operate, Maintain and Transfer the Debt Management Office’s Corporate Office Building, Abuja
| The Debt Management Office (DMO) | LOH & OR Construction Nigeria Limited | 30 years from effective date Contract signed. in 2015 | The contract has not commenced due to the Concessionaire’s inability to achieve financial close. |
30 | Concession for the renovation of 18 Blocks Student Hostel of the Kaduna Polytechnic
| The Kaduna Polytechnic
| Mark Point Project Limited
| Contract is for 14 years from effective date.
Contract signed. on 21st August, 2020. Expire on 20th August 2034.
| Contract is under re-construction phase
Concessionaire has mobilized to site and re construction work has commenced.
|
Inland Container Depot Infrastructure Sector
| |||||
31 | Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Abia State)
| Nigerian Shippers Council (NSC) | Eastgate Inland Container Depot Ltd | 30 Years from 2007 | The contract is under review by the parties.
The Commission is monitoring compliance with the terms and conditions of the agreement.
|
32 | Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Oyo State) | Nigerian Shippers Council (NSC) | Catamaran Logistics Ltd | 25 Years from 2007 | This contract is under review by the parties
The Commission is monitoring compliance with the terms and conditions of the agreement.
|
33 | Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Plateau State) | Nigerian Shippers Council (NSC) | Duncan Maritime Ventures Nigeria Ltd | 25 Years from 2007 | The Commission is monitoring compliance with the terms and conditions of the agreement.
|
34 | Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Kano State) | Nigerian Shippers Council (NSC) | Dala Inland Dry Port Nigeria Ltd | 25 Years from 2007 | The new investor for the project has injected N2.5 billion into the project construction work.
Investor has mobilized to site. |
35 | Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Katsina State) | Nigerian Shippers Council (NSC) | Equatorial Marine Oil and Gas Company Ltd | 25 Years from 2007 | A Ministerial Task Force for the completion of Funtua Inland Dry Port has been constituted to ensure completion and commissioning in March, 2022.
|
36 | Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Borno State) | Nigerian Shippers Council (NSC) | Migfo Nigeria Limited | 25 Years from 2007 | The Commission is monitoring compliance with the terms and conditions of the agreement.
|
Telecommunications (Fibre Optic) Infrastructure Sector
| |||||
37 | Concession Agreement for the Design, Build, Finance, Operate TCN’s Fibre Optic Cable Telecommunications Infrastructure for the Western part of Nigeria
| Transmission Company of Nigeria | Phase 3 Telecom Ltd | 15 Years March 2006 -2021
| Under Implementation
Parties have signed the addendum to the principal agreement after the concurrences to the agreement by the Federal Ministry of Justice (FMoJ), TCN Board & NERC.
|
38 | Concession Agreement for the Design, Build, Finance, Operate TCN’s Fibre Optic Cable Telecommunications Infrastructure for the Eastern part of Nigeria
| Transmission Company of Nigeria | Alheri Engineering Services L td | 15 Years March 2006 -2021
| Under Implementation Parties have signed the Addendum to the principal agreement after the concurrences to the agreement by the Federal Ministry of Justice (FMoJ), TCN Board & NERC.
|
Aviation Infrastructure Sector | |||||
39 | Concession to Design, Develop, Finance, Construct, Complete, Test, Commission, Operate, Manage, Maintain and Transfer of the Muritala Muhammed Airport Ikeja – Lagos Domestic Terminal (Lagos)
| The Federal Airports Authority of Nigeria (FAAN) | Bi -Courtney Ltd | Initially 12 Years April 24th 2003 – April 23rd 2015 *Extension granted through an Addendum to the Concession Agreement signed by Parties on 2nd February 2007 for an extension of 36 years | Under Implementation
A joint committee has been set up by FAAN and Bi-Courtney to resolve the contractual disputes between the parties.
|
40 | Concession for the Construction and Development of a Four-Star Hotel at the Muritala Muhammed Airport Ikeja - Lagos | Federal Ministry of Transportation /Federal Airports Authority of Nigeria | Bi -Courtney Ltd | 40 Years September 27th 2005 To September 26th 2045
| Construction stalled.
A joint committee has been set up by FAAN and Bi-Courtney to resolve the contractual disputes between the parties.
|
41 | Concession for the Construction and Development of a Conference Centre at the Muritala Muhammed Airport Ikeja - Lagos | Federal Airports Authority of Nigeria | Bi -Courtney Ltd | 40 Years November 21st 2006 – 20th November 2046 | Construction stalled.
A joint committee has been set up by FAAN and Bi-Courtney to resolve the contractual disputes between the parties.
|
42 | Concession for the Acquisition, Installation, Operation and Management of World Class Integrated System in Designated Airports (MMA –Lagos, Abuja & Kano) | The Federal Airports Authority of Nigeria | Maevis Nigeria Ltd | 10 years October 2007 – October 2017 Terminated -2012
| Contract terminated.
The Commission is engaging the parties on amicable settlement of the dispute through the mediation process.
|
District Engineering Infrastructure Sector
| |||||
43 | Concession for the Development of Engineering Infrastructure for Arterial roads, Storm water drainage network, Sewage network, Electrical distribution network and Telcom duct at the Katampe District, Phase II Federal Capital Territory (FCT) Abuja | The Federal Capital Development Authority (FCDA)/ Federal Capital Territory Authority (FCTA) | Deanshanger Project Ltd | 5 years October 2010 – October 2015
| Contract execution stalled.
The FCT inter-ministerial Committee is working to resolve the challenges of executing the contract. |
Housing Development Infrastructure Sector
| |||||
44 | Concession Agreement for the Reclamation and Infrastructural Development of FESTAC Phase II Housing Development Project –FESTAC Town, Lagos.
| Federal Ministry of Lands, Housing and Urban Development/The Federal Housing Authority (FHA) | New FESTAC Property Development Company Ltd | 30 years 8th September 2014 -7th September 2044 | Currently stalled as a result of a court case. The Community is in court over land ownership with the Federal Housing Authority.
The project land area has been encroached by the local communities. |
Mining (Iron ore) Infrastructure Sector
| |||||
45 | Concession for the Rehabilitation, Completion, Management and Operation of the National Iron Ore Mining Company Ltd, including the right to Expand, Prospect, Explore, Excavate, Extract and Sales of the Ore and Products there from | Federal Ministry of Solid Minerals Development/National Iron Ore Mining Company Ltd | Global Infrastructure Nig Ltd/Global Steel Holdings Ltd
| First entered into on 17th February, 2005 Following International Settlement, Modified Concession Agreement entered into Commencement Date: 1st August, 2016
Agreement has duration of Seven (7) Years from Effective Date | Contract suspended.
The Commission is monitoring compliance with the terms and conditions of the agreement.
A Presidential Project Implementation Team (PPIT) has been set up to work out modalities towards resuscitating the Ajaokuta Steel Complex. ICRC is a member of the PPIT.
|
Defence Infrastructure Sector
| |||||
46 | Public Private Partnership and Joint Venture Agreement for the Establishment of a Military Clothing Factory Kaduna, Kaduna State | Defence Industries Corporation of Nigeria (DICON)
| SUR Corporate Wear Tasarim Dani Manlik GYM SAN VE TIC AS (SUR) Turkey | 50 years 24th October 2019 - | Contract signed..
The Commission is monitoring compliance with the terms and conditions of the agreement.
The Construction work is at advanced stage about 60% completed rate on the factory building.
|
47 | Concession contract for the Design, Finance, Upgrade, Operate and transfer of the Nigerian Correctional Service Shoe and garment Factories at Aba in Abia State and the Leather (Tannery) Factory at Janguza, Kano State, under a Public Private partnership arrangement. | Nigerian Correctional Service (NCoS) | Erojim Invesment Limited | 20 years 13th January 2021- 12th January 2041 | Contract signed..
The Commission has taken custody of the Contract and is monitoring compliance with the terms and conditions of the agreement.
|
48 | Concession contract of the integrated digital trunking communications system designed to provide a robust, reliable, secured and independent multimedia communication systems (voice, video and data) for the Nigerian Police Force and other security agencies of government. | Federal Ministry of Police Affairs | Messrs. MPS Technologies Ltd | 30 years, with the first 36 months designated for rehabilitation work | Contract signed..
Provision of power to 50 base stations are ongoing.
A co-location license has been granted to MPS Tech. by the NCC. |
Information Technology and Communication Infrastructure Sector
| |||||
49 | Concession for the Production of ECOWAS Biometric Identity Cards
| Federal Ministry of Interior | Euphoria Press Limited | 10 years 16th April 2019 – 15 April 2029 | Contract signed.
The Commission has taken custody of the Contract and is monitoring compliance with the terms and conditions of the agreement.
|
50 | Concession contract for the Design, Development, and Management of a Secured Ticketing solution for the NRC Rail Services for the Five (5) stations along NRC rail Corridor between Abuja and Kaduna. | Nigerian Railway Corporation (NRC) | SecureID Limited | 10 years 18th November, 2020 - 17th November, 2020, subject to any future amendment on the contract term
| Contract signed.
The Commission has taken custody of the Contract and is monitoring compliance with the terms and conditions of the agreement.
|
51 | Concession Agreement for the Implementation of the Nigeria Harmonised ECOWAS Electronic (SMART) Passport and Autogate Systems
| Federal Ministry of Interior formerly Federal Ministry of Internal Affairs
| IRIS Smart Technologies Ltd | Implementation was supposed to be for 2 years from 14th May, 2003
| Contract signed.
Commission has taken custody of Concession Agreements and commenced monitoring of efficient execution of contractual terms.
|
Electricity (Hydro & Solar) Infrastructure Sector
| |||||
52 | Concession Agreements for the Operation, Maintenance, Design and Sales of electricity produce – Niger State
| Kainji Hydro Electricity Plc | Mainstream Energy Solutions Ltd | 30 Years 21st February 2013 – 20th February 2043 | Under implementation.
The Operator has carried out replacement of 2 Hydraulic Power Unit (HPU) at Kainji and 3 sets of HPU at Jebba to ensure optimal power generation
|
53 | Concession Agreements for the Operation, Maintenance, Design and Sales of electricity produce – Niger State | Shiroro Hydro Electric Plc | North South Power Company Ltd | 30 Years 21st February 2013 – 20th February 2043 | Under implementation.
Currently generating about 150MW on average. During peak and off-peak periods, the plant generates 270MW and 100MW respectively.
|
54 | Concession for the Design, Construct, Install, Operate and Maintain the Dadin Kowa Hyro Dam for the purpose of Electricity Generation with a capacity of 39 MW – Gombe State | Federal Ministry of Water Resources | Mabon Limited | 25 years from 4th July, 2005
Addendum to the agreement signed on 4th August, 2016
Commencement from Effective Date: Upon Reaching Financial Close | Under implementation.
The Hydro Station commenced generation in December, 2020
Generating 16MW of electricity and supplying to the National grid.
|
55 | Concession of Gurara Hydro Power Project Kaduna Operate and Maintain PPP project (30 Mega Watts) | Federal Ministry of Water Resources | North South Power Company Limited
| 25 years from commencement date
Contract signed.; 12th May, 2020
| Under implementation.
The Concessionaire is collaborating with TCN to carry out repairs on the transmission lines and substations;
|
56 | Concession for the Service Management of Gurara Phase 1 Multipurpose Dam Facilities
| Federal Ministry of Water Resources | Messrs Gams and Abell Ltd, in Conjunction with Ryzyn Global Inc USA
| 10 years 30th December 2019 – 29th December 2029
| Under implementation.
The Commission is monitoring compliance with the terms and conditions of the agreement.
Concessionaire is liaising with TCN, NBET, NERC to obtain approvals to support service operations.
|
57 | Concession of Rooftop solar Power,750 kilowatts (KW) solar power system for Federal Ministry of Power, Works and Housing (Power House) building in Abuja | Federal Ministry of Power, Works and Housing (Power Sector) | Proserve Energy Ltd
| 10 years 14th March 2019 – 13th March 2029 | Under implementation.
The Commission is monitoring compliance with the terms and conditions of the agreement.
Concessionaire has secured financing from the Nigerian Infrastructure Development Fund
Power Purchase Agreement (PPA) has been signed.
|
Agriculture (Silos- Storage) Infrastructure Sector
| |||||
58 | Concession of Grain Storage Facilities for food storage (Silos) in Ado Ekiti | Federal Ministry of Agriculture and Rural Development | Agro-Universal Consortium | 10 Years 2018 – 2028 | Under implementation. The Commission has taken custody of the Concession Agreement and initial operational activities have commenced. |
59 | Concession of Grain Storage Facilities for food storage (Silos) in Akure | Federal Ministry of Agriculture and Rural Development | Agro-Universal Consortium | 10 Years 2018 – 2028 | Under implementation. The Commission has taken custody of the Concession Agreement and initial operational activities have commenced. |
60 | Concession of Grain Storage Facilities for food storage (Silos) in Gaya | Federal Ministry of Agriculture and Rural Development | Agro-Universal Consortium | 10 Years 2018 – 2028 | Under implementation. The Commission has taken custody of the Concession Agreement and initial operational activities have commenced. |
61 | Concession of Grain Storage Facilities for food storage (Silos) in Ikenne | Federal Ministry of Agriculture and Rural Development | Agro-Universal Consortium | 10 Years 2018 - 2028 | Under implementation. The Commission has taken custody of the Concession Agreement and initial operational activities have commenced. |
62 | Concession of Grain Storage Facilities for food storage (Silos) in Jos | Federal Ministry of Agriculture and Rural Development | Agro-Universal Consortium | 10 Years 2018 – 2028 | Under implementation. The Commission has taken custody of the Concession Agreement and initial operational activities have commenced. |
63 | Concession of Grain Storage Facilities for food storage (Silos) in Ogoja | Federal Ministry of Agriculture and Rural Development | Agro-Universal Consortium | 10 Years 2018 – 2028 | Under implementation. The Commission has taken custody of the Concession Agreement and initial operational activities have commenced. |
64 | Concession of Grain Storage Facilities for food storage (Silos) in Sokoto | Federal Ministry of Agriculture and Rural Development | Agro-Universal Consortium | 10 Years 2018 - 2028 | Under implementation. The Commission has taken custody of the Concession Agreement and initial operational activities have commenced. |
65 | Concession of Grain Storage Facilities for food storage (Silos) in Igbariam | Federal Ministry of Agriculture and Rural Development | Coscharis Farms Limited
| 10 Years 2018 – 2028 | Under implementation. The Commission has taken custody of the Concession Agreement and initial operational activities have commenced. |
66 | Concession of Grain Storage Facilities for food storage (Silos) in Ezillo | Federal Ministry of Agriculture and Rural Development | Ebony Agro Industries Ltd
| 10 Years 2018 – 2028 | Under implementation. The Commission has taken custody of the Concession Agreement and initial operational activities have commenced. |
67 | Concession of Grain Storage Facilities for food storage (Silos) in Ibadan | Federal Ministry of Agriculture and Rural Development | Independent Ltd
| 10 Years 2018 - 2028 | Under implementation. The Commission has taken custody of the Concession Agreement and initial operational activities have commenced. |
68 | Concession of Grain Storage Facilities for food storage (Silos) in Bulasa | Federal Ministry of Agriculture and Rural Development | Matrixville Consortium Ltd
| 10 Years 2018 – 2028 | Under implementation. The Commission has taken custody of the Concession Agreement and initial operational activities have commenced. |
69 | Concession of Grain Storage Facilities for food storage (Silos) in Jahun | Federal Ministry of Agriculture and Rural Development | Matrixville Consortium Ltd
| 10 Years 2018 – 2028 | Under implementation. The Commission has taken custody of the Concession Agreement and initial operational activities have commenced.
|
70 | Concession of Grain Storage Facilities for food storage (Silos) in Kaduna | Federal Ministry of Agriculture and Rural Development | Matrixville Consortium Ltd
| 10 Years 2018 - 2028 | Under implementation. The Commission has taken custody of the Concession Agreement and initial operational activities have commenced.
|
71 | Concession of Grain Storage Facilities for food storage (Silos) in Kwali, | Federal Ministry of Agriculture and Rural Development | Matrixville Consortium Ltd
| 10 Years 2018 – 2028 | Under implementation. The Commission has taken custody of the Concession Agreement and initial operational activities have commenced. |
72 | Concession of Grain Storage Facilities for food storage (Silos) in Lafiagi, | Federal Ministry of Agriculture and Rural Development | Matrixville Consortium Ltd
| 10 Years 2018 – 2028 | Under implementation. The Commission has taken custody of the Concession Agreement and initial operational activities have commenced.
|
73 | Concession of Grain Storage Facilities for food storage (Silos) in Uyo | Federal Ministry of Agriculture and Rural Development | Neon Farms Ltd
| 10 Years 2018 – 2028 | Under implementation. The Commission has taken custody of the Concession Agreement and initial operational activities have commenced.
|
74 | Concession of Grain Storage Facilities for food storage (Silos) in Gombe | Federal Ministry of Agriculture and Rural Development | Servewell Agricultural Services Limited | 10 Years 2018 - 2028 | Under implementation.
The Commission has taken custody of the Concession Agreement and initial operational activities have commenced.
|
75 | Concession of Grain Storage Facilities for food storage (Silos) in Makurdi | Federal Ministry of Agriculture and Rural Development | Upland Grains Ltd
| 10 Years 2018 - 2028 | Under implementation. The Commission has taken custody of the Concession Agreement and initial operational activities have commenced. |