ICRC superintends and regulates PPPs in Nigeria

Projects Under Development and Procurement (Pre-contract)


 

INFRASTRUCTURE CONCESSION REGULATORY COMMISSION
PRE-CONTRACT PROJECTS (AT DEVELOPMENT AND PROCUREMENT) STATUS REPORT, AS AT 30th September, 2021
(IN SECTOR FORMAT)
S/NMDAPROJECT / DESCRIPTIONSECTORSTATUSPHASE
1Federal Ministry of Agriculture and Rural DevelopmentDeployment of 2,000 units of tractors and other mechanized equipment to Federal Ministry of Agriculture and Rural Development through SMART total mechanization package.AgricultureOn April 16, 2018 representatives of FMARD and Nigeria Agriculture Mechanization and Equipment Leasing Limited (NAMEL) made a presentation to the Commission on the proposed PPP arrangement titled ‘Solutions for Sustainable Food Production’.Development
2Federal Ministry of Agriculture and Rural DevelopmentProjects, involving PPPs on:
i. Federal Coastal Fishery Terminal, Ebughu, Akwa Ibom State
ii. Federal Coastal Fishery Terminal, Borokiri Rivers State
iii. Fish Processing Centre, Jebba, Kwara State
iv. Agro Aviation Hangar, Kaduna
Agriculture

The Commission granted joint OBC/FBC Compliance Certificates for the Akwa Ibom and Rivers State Coastal Fishery Terminals on February 28, 2018.

A letter was received on 22nd July, 2020 from the Ministry for advice on underlying issues regarding the process of engaging the two preferred partners on Ebughu and Borokiri Terminals.
The Full Business Case for the Federal Coastal Fishery Terminal Egbughu-Akwa Ibom State has been revalidated on September 27, 2021

Procurement
3National Veterinary Research Institute/
Federal Ministry of Health
Vaccine Production Facility
National Veterinary Research Institute (NVRI) is desirous to commercialize vaccine production within the institute.
Agri-Health

The Commission advised NVRI on the composition of the Project Steering Committee (PSC).

ICRC is awaiting the confirmation of a suitable date for the inauguration of the PSC.

Development
4Federal Ministry of AviationConcession of Mallam Aminu Kano International Airport, Kano
The FGN proposed to concession the Mallam Aminu Kano International Airport Terminal Building, Kano State as part of aviation sector reform programme
Aviation

Proserve Consortium was procured as Transaction Advisers (TA).

ICRC received revised Outline Business Case (OBC) report on 22nd Oct, 2019; and issued OBC compliance certificate on 22nd June, 2020

Next step:

Procurement of suitable investor for the project

Procurement
5Federal Ministry of AviationConcession of Port Harcourt International Airport
The FGN proposed to concession the Port Harcourt International Airport Terminal Building, Rivers State as part of aviation sector reform programme
Aviation

Proserve Consortium was procured as Transaction Advisers (TAs).

ICRC received revised Outline Business Case (OBC) report on 22nd Oct, 2019; and issued OBC compliance certificate on 22nd June, 2020

Next step:
Procurement of suitable investor for the project

Procurement
6Federal Ministry of AviationConcession of Murtala Muhammed International Airport, Lagos
The FGN proposed to concession the Murtala Muhammed International Airport Terminal Building, Lagos State as part of aviation sector reform programme
Aviation

Proserve Consortium was procured as Transaction Advisers (TAs).

ICRC received revised Outline Business Case (OBC) report on 22nd Oct, 2019; and issued OBC compliance certificate on 22nd June, 2020

Next step:
Procurement of suitable investor for the project

Procurement
7Federal Ministry of AviationConcession of Nnamdi Azikiwe International Airport, Abuja
The FGN proposed to concession the Nnamdi Azikiwe International Airport Terminal Building, Abuja-FCT as part of aviation sector reform programme
AviationProserve Consortium was procured as Transaction Advisers (TAs).
ICRC received revised Outline Business Case (OBC) report on 22nd Oct, 2019; and issued OBC compliance certificate on 22nd June, 2020

Next step:
Procurement of suitable investor for the project

Procurement
8Federal Ministry of AviationDevelopment of a Maintenance, Repairs and Overhaul (MRO) Facility
The FGN intends to establish an MRO facility for aircraft maintenance, inspections and supply of parts to the aviation sector
Aviation

Catamaran Consortium was procured as Transaction Advisers (TAs).

OBC Compliance Certificate issued 21st May, 2018.

The Ministry approved the RFQ evaluation report for the selection of concessionaire.

RFP was issued to the qualified bidders and Bidders’ Conference held on 24th February, 2020

Submission of Proposal by the qualified bidders for evaluation.

Next step:
Awaiting report of the evaluation process with selection of the preferred bidder from the Ministry

Procurement
9Federal Ministry of AviationEstablishment of an Aviation Leasing Company (ALC)
The FGN intends to establish an ALC for the leasing of aircrafts to operators in the country and the continent as none exist in Africa at the moment.
Aviation

Catamaran Consortium was procured as Transaction Advisers (TAs).

OBC Compliance Certificate issued 21st May, 2018.

The Ministry approved the RFQ evaluation report for the selection of concessionaire.

RFP has been issued to the qualified bidders and Bidders’ Conference held on 24th February, 2020
Submission of Proposal by the qualified bidders for evaluation.

Next step:
Awaiting report of the evaluation process with selection of the preferred bidder from the Ministry

Draft Contract Agreement for the project was sent to the Commission on June 21, 2021

Procurement
10Federal Ministry of AviationDevelopment of an Aerotropolis (Airport City)
The FGN intends to develop an Aerotropolis in a suitable location to be determined by the Transaction Adviser. This entails the setting up and development of structures that will support the activities around the airport and aviation in general.
Aviation

The Commission received an Updated Outline Business Case report on 25th May, 2021. The review of the OBC is ongoing while waiting on a detailed Financial Model to conclude the review process.

Next step:
Awaiting detailed Financial Model to conclude the review process.

Development
11Federal Ministry of AviationDevelopment of a 6 Cargo/Agro Airports in the Geo-Political zones
The FGN intends to develop 6 Cargo/Agro airports in each of the geo-political zones to provide cargo handling and specialized logistics for agro products.
AviationThe Infrastructure Bank (TIB) Consortium was procured as Transaction Advisers (TAs)
The Commission received an Outline Business Case (OBS) report and currently under reviewing.

Next step:
Certification of OBC report

Development
12Federal Ministry of AviationEstablishment of a National Carrier
The FGN intends to establish a National Carrier for the country through a PPP arrangement. The national carrier will have a hub in a designated airport as one of the outcomes of the assignment from the TA.
AviationFederal Executive Council has approved to replace Lufthansa Consulting with Airline Management Group (AMG) to undertake the Transaction Advisory assignment.
• The Project Proposal received on 29th June, 2018
• OBC Certificate of Compliance Issued by ICRC on 6th July, 2018
The official Name (Nigeria Air) and Logo were unveiled with an Investor Teaser at Farnborough Air show on 18th July 2018
• OBC Certificate was revalidated 25th November, 2019

The Commission once again revalidated and re-issued OBC Compliance Certificate to the FMoA on 28th September, 2020

The Commission withdrew the OBC Certificate issued on 28th September, 2020 and re-issued another OBC Certificate of Compliance dated 18th December, 2020 to enable the Aviation Ministry proceed to procurement stage.

Next step:
Procurement process for the selection of suitable investor

Procurement
13National Commission for Museums & Monuments/ Federal Ministry of Information & CultureDevelopment of Recreational Park within the Museum premises, Enugu.
(Unsolicited Proposal): An unsolicited proposal submitted to the National Commission for Museums & Monuments to develop recreational park in Enugu, within the Museum premises.
CultureOBC Compliance Certificate granted on October 16, 2017.
EoI has been prepared for advert.
As an unsolicited proposal the project shall go through Swiss Challenge methodology to ensure competition and Transparency.
Next Step: Submission and Evaluation of EoIs.
Development
14Federal Ministry of Information and CultureNational Theatre
(Solicited Proposal)
: The project involves the development of 65 hectares of the 134 hectares fallow land around the National Theatre by building 5-star hotel, office buildings, leisure Park, shopping mall and Multi Level car park.
CultureFull Business Case (FBC) Certificate of Compliance revalidation has been granted by ICRC.
Ministry is to submit FBC for approval by FEC
Procurement
15Federal Ministry of Information and CultureDevelopment of National Council for Arts and Culture’s land through PPP
The Council is desirous of developing an edifice on its parcel of Land located at Central Business District, Abuja through PPP that will comprise the following:
i.  Culture and Arts Theatre
ii. Office Development for use by
NCAC
iii. Conference and event exhibition hall,
Shopping Mall
CultureThe Ministry is required to engage a Transaction Adviser to prepare an Outline Business Case to determine project viability and bankability.Development
16Federal Ministry of EducationPPPs involving the following:
i. Upgrade of the ICT Laboratories/Business Centers in Federal Schools
ii. Upgrade of existing libraries
Upgrade of vocational schools
EducationThe Ministry is in the process of procuring Transaction Advisers to prepare Outline Business Cases to determine the projects’ viability and bankability.Development
17Federal Ministry of EducationNational Mathematical Center
i. Development of an International Conference Center
Construction of National Mathematical Centre-International Science Academy (NMC-IMSA)
EducationThe Ministry is in the process of procuring Transaction Advisers to prepare Outline Business Cases to determine the projects’ viability and bankability.Development
18Federal Ministry of Education / Federal University Gusau (FUG) PPPs involving the following:
i. Proposed construction of Students Hostel, 500-Units of Staff Housing, Roads & Drainages, Shopping Mall, Staff/Students Cafeteria, Bio-gas Electricity Power plant and Poultry Farm
ii. On-line application System for e-registration platform, Computation / compilation of Students’ results, e-Learning and web portal development.
Proposed construction of Vice Chancellor’s Lodge, Pro-Chancellor’s Lodge, Principal Officers’ Quarters, Senior Staff Housing, Junior Staff Housing, External Electrification, Borehole & Overhead Tanks, etc
EducationThe University is in the process of procuring Transaction Advisers to prepare an Outline Business Cases to determine the projects’ viability and bankability
ICRC reviewed the submitted documents in line with statutory processes. University written to supply additional information on the project and also confirm availability of land space for the entire project.
Development
19Federal Ministry of EducationComputer Based Test Centre (National Business and Technical Examinations Board)
The Computer Based Test (CBT) Centre project is to enhance efficiencies of candidates in Technical and Vocational Education through Information and Computer Technology.
EducationThe Project is currently functional but the NABTEB has been asked by the Commission to forward relevant documents on the project to the Commission.
The Business Case and Executed Contract Agreement were reviewed and it was found that it did not satisfy the key features of PPP contracts. The Commission requested additional documents to incorporate the issues raised.

The Board has been advised to submit a Joint OBC/FBC for review.

Procurement
20Federal Ministry of EducationDevelopment of Commercial Hub at National Open University of Nigeria (NOUN)
The National Open University of Nigeria is desirous of building a commercial hub for the University Community within the campus at Jabi, Abuja using the PPP arrangement.  The complex will have the following facilities Banking malls, Supermarket, Restaurants, Bookstore, retail shops etc
EducationICRC issued an OBC Certificate of Compliance on the October 7, 2017Development
21Federal Ministry of Education/ University of AbujaDevelopment of Students Hostel at University of Abuja
The University intends to build hostels for its teeming students as well as staff housing estate using PPP
EducationOBC certificate of Compliance was granted on 23rd September, 2020.
Letter nominating PSC and PDT members was sent to UNIABUJA on 20/11/2020

Meeting with the PPP Unit, UNIABUJA held on Wednesday, the 16th of December, 2020.The meeting was at the request of UNIABUJA to discuss the way forward on the proposed hostel development in the University. The Commission had issued an OBC Compliance Certificate to the University but included some requirements that must be met before the project could proceed.
20 Prospective bidders submitted their bids and Technical Evaluation of the bids was carried out between Friday 22- Monday 25 January 2021. Inauguration of PSC and PDT held on the 26th January 2021. Next step is the submission of Evaluation report.
Meeting of the PDT held on February 4, 2021 at the Bursars Conference Room, Main Campus.
RFP issued to bidders. Pre-bidders conference held on the 13th April, 2021. Review of the Concession Agreement on-going.
Reviewed the RFP & Contract agreement documents and advised that the draft Contract agreement be recalled and amended on the 28th May 2021.

Development
22Upgrade and concession of hostel at Public Service Institute of NigeriaUpgrade and Concession of Properties through PPP methodology
Public Service Institute of Nigeria is desirous of using PPP procurement methodology to upgrade and concession to private party its 108 rooms female hostel and another 27 rooms purpose built guest chalet.
EducationThe project is currently in development phase. The Institute is working with consultants to prepare an Outline Business Case to determine project viability and bankability.Development
23Federal Ministry of Health/UCH, IbadanDevelopment of Shopping Mall, University College Hospital (UCH), Ibadan
UCH seeks to develop a Shopping Mall through PPP Procurement.
Education

Sensitization workshop and Inaugural PDT meeting held on October 17 & 19, 2017 at the Hospital premises

Arrangements are in place to regularize the existing MoU with the Concessionaire. A meeting took place at Federal Ministry of Health in October 2020.

Development
24Federal University, Wukari/Federal Ministry of EducationDevelopment of hostel facilities and accommodation for Staff and StudentsEducationThe submitted project proposal document has been reviewed and the University was advised to prepare an OBC.
Awaiting the University’s response.
Development
25Federal Ministry of Education / Federal College of Education, Ogun StateDevelopment of Student Hostels at Federal College of Education Abeokuta, Ogun State
Federal College of Education Abeokuta seeks guidance to develop hostel accommodation using PPP procurement process.
EducationThe necessary documents and additional information requested by the Commission have been reviewed and the University has been advised accordingly through a letter written January 25th, 2019.Development
26Federal Ministry of PowerEnergizing Education Program
Electrification Program of Tertiary Institutions initiated by the FMPW&H to develop off-grid power plant projects in order to provide uninterrupted and dedicated power supply to forty (40) Federal Universities and neighboring University Teaching Hospitals across the Federation.
EducationThe FMPW&H is to prepare a structuring report and submit to ICRCDevelopment
27University of Calabar/ Federal Ministry of Education400 Room Students Hostel
The project consists of two hostels that will comprise 400 rooms on a 1.9 Hectares land within the University of Calabar premises and is estimated to cost N1,326,000,000 with a completion period of 9 months.  On completion, each Hostel will house 1,600 students, making a total of 3,200 students for the two Hostels.
EducationUNICAL has been advised to repackage the project to meet requirements of N4P and ICRC ActDevelopment
28Kaduna Polytechnic / Ministry of EducationRehabilitation of Students’ hostel
In line with the desire to bridge the infrastructural gap in Kaduna Polytechnic, the Institution is committed to develop solutions for its infrastructural decay and to solicit for financiers for the institution’s infrastructure development Projects. Namely; the Renovation of Students’ hostel.
EducationFBC issued on 12th February 2020
FEC approval FBC on 8th July 2020.
Concession Agreement signed on 21st August, 2020
Procurement
29Federal Ministry of Education/ National Commission for Colleges of Education (NCCE)Development of Hostel Accommodation for Colleges of Education
The Ministry received an unsolicited proposal by Adonai Ventures Ltd to build hostel accommodation for Colleges of Education in Nigeria.
EducationA stakeholders meeting held on 17th April, 2019 to discuss the unsolicited proposal by Adonai Ventures Ltd to build hostel accommodation for Colleges of Education in Nigeria.Development
30Federal Ministry of Education/University of Port-HarcourtRegularization of Build Operate and Transfer Process for the development of Retail and Entertainment Centre
The University of Port-Harcourt seeks to regularize an ongoing PPP Project to conform with National PPP Laws
EducationICRC reviewed a signed agreement with regards to the project with the aim of regularizing and legalizing the PPP process that was started by the University, but which had not gone through ICRC, to conform with the ICRC Act.Development
31Federal Ministry of Education/University of Port-HarcourtDevelopment and Construction Of Private Students’ Hostel Accommodation For University Of Port-HarcourtEducationThe Commission has reviewed the submitted OBC and has advised the University accordingly.Development
32Federal Ministry of Education/University of Port-HarcourtRegularization of Build Operate and Transfer Process for the development of Entertainment Centre
The University of Port-Harcourt seeks to regularize an ongoing PPP Project to conform with National PPP Laws
EducationThe review of the Project Structuring report is ongoingDevelopment
33Federal Ministry of Education/Federal University of Petroleum Resources, Effurun, Delta StateEstablishment of a Bespoke food Court on Design, Finance, Build, Operate and Transfer (DFBOT) Scheme.EducationReceived the OBC document on 27th April 2021 and review is ongoing in line with pre-contract regulatory  A letter issued to the University on 11th June, 2021 declining the issuance of OBC Certificate. Received an updated OBC from the University on the 30/8/2021 and review is on-going.                                                                                OBC Compliance Certificate issued on the 30th of September, 2021Development
34Federal Ministry of Education/University of Port HarcourtThe University seeks to develop and construct 110 units of shops. The shopping complex is to be procured via PPP with OSIWOKS Nig. Ltd and is to be located close to the Presidential and Medical hostels in the Abuja Park.EducationReview of the document is on goingDevelopment
35Federal Ministry of Education/University of Port HarcourtThe University seeks for the establishment of a Loading Bay for Taxis/Buses, University Park by the main gate area (Abuja Park).EducationReview of the document is on goingDevelopment
36Federal Ministry of Education/ University of UyoConstruction Of students Hostels on a PPP arrangement.
The University of Uyo is seeking to collaborate with a Private Proponent for the development of students hostels at the various campuses of the University with a capacity for 12,000 bed spaces.
EducationThe Commission has reviewed the OBC document and advised the University to provide more information to confirm viability and bankability of the project.
Nominated members of the PSC and PDT to represent ICR for UNIUYO hostel project on 26th May 2021.Inauguration of PSC & PDT scheduled for the 9th and 10th of August respectively. PSC & PDT was inaugurated on 9th August, inaugural PDT meeting and site visit to the allocated land held same day.
Development
37Federal Ministry of Health/University College Hospital IbadanEstablishment and Operation of an Independent Power Plant in the HospitalEducation/ EnergyA letter dated 2nd July, 2021 was sent to the Ministry to provide more information to confirm viability and bankability of the project.Development
38Federal Ministry of Health/ University of Ibadan College HospitalRe: Request for Approval for the Establishment and Operation of an Independent Power Plant in the University College HospitalEducation/ Power

Review of Power Purchase agreement between BU Power Ltd and University is on-going.

Reviewed the Power Purchase agreement between BU Power Ltd and our comments submitted on the 17th May to DCCD as the head of task team

Development
39Airforce Institute of Technology, KadunaUnsolicited proposal submitted by private proponents on the development of students’ hostelsEducation/ Urban DevelopmentMet with the Management team on the 9th June 2021 and highlighted the processes of Solicited and Unsolicited processes.Development
40Ahmadu Bello University ZariaDevelopment of Shopping Complex and Luxury Apartmets at GRA Zaria through a PPP arrangementEducation/Urban DevelopmentThe University proposes to develop infrastructure through PPP, and have submitted a concept note for review.Development
41Federal Ministry of Water ResourcesGurara 2 Greenfield Multi-Purpose Dam
The Concession of the Gurara 2 Greenfield multi-purpose Dam, Niger State includes 300MW of hydropower components of the dam.
EnergyThe project is currently in Development Phase. The project land is encumbered and the Ministry is resolving the issue. Thereafter, the Outline Business Case is expected to be forwarded to ICRC. Awaiting the Ministry’s responseDevelopment
42Federal Ministry of Water ResourcesOwena Multi-Purpose Dam water supply (Unsolicited Proposal)
The project will provide about 1.5kwh of electricity to the national grid.
EnergyThe Commission granted OBC Certificate of Compliance on March 10, 2017.Development
43Federal Ministry of Water ResourcesDevelopment of 9MW Oyan Dam Unsolicited
This involves the Operations and Maintenance of 9MW hydroelectric power.
EnergyThe Commission has revalidated the OBC Certificate of Compliance (which expired on March 8, 2018) since all key parameters remained the sameDevelopment
44Federal Ministry of Water ResourcesDevelopment of 220MW River Mada Medium hydropower plant in Nasarawa State
This involves the Operations and Maintenance of 220MW hydroelectric power.
EnergyThe Commission reviewed the updated OBC and issued a Compliance Certificate on February 23, 2018.Development
45Federal Ministry of Water ResourcesOther PPP Projects:
i. Development of Tede Dam for Hydro power and other purposes.
ii. Concession of Oturkpo Dam for Hydro Power and other purposes.
Development of Dasin Hausa Dam for Hydro power and other purposes.
EnergyThe Ministry has been advised to procure a Transaction Adviser that will prepare a bankable OBC report for the project.Development
46Federal Ministry of Mines and SteelAjaokuta Steel company Ltd & National Iron Ore Mining Company (NIOMCO)
Rehabilitation, completion, management and operation of Ajaokuta Steel Company and National Iron Ore Mining Company (NIOMCO) through PPP Concession agreement.
EnergyMonitoring visit took place to Ajaokuta Steel Complex and National Iron Ore Mining Corporation, Itakpe (from 24th - 26th  April, 2018.)
Selection of Transaction Adviser for the concession of Ajaokuta Steel Company (ASCL) is ongoing.
Development
47Federal Ministry of Power/Nigerian Electricity Management Services Agency (NEMSA)Transformer Repair Services
The project is an unsolicited proposal submitted by Kilowatt Electrics Limited (KWEL) to the NEMSA. KWEL is proposing a joint venture partnership with NEMSA to operate the transformer repairs workshop in Ijora Lagos and construction of transformer repair workshops in Port Harcourt and Kaduna centers. The partnership will also include the role of electrical inspection, testing and certification of all electrical installation hitherto performed by NEMSA.
EnergyThe Commission wrote a letter to Nigerian Electricity Management Services Agency (NEMSA) on 3rd January, 2020 inviting the MD to note the observations and recommendations with respect to the draft Concession Agreement.
Extension of time for submission of the RFP by the lone bidder was granted by the Commission.

The Commission accompanied an inspection team lead by NEMSA to inspect the project site in Lagos in 18th-20th November 2020 in readiness for the RfP submission by the Bidder

PDT meeting held on April 15, 2021. Deadline for RfP submission was put at April 30, 2021.

Technical Bid opening for concessionaire took place on May 17, 2021
Financial Bid opening for concessionaire took place on  June 7, 2021

Procurement
48Federal Capital Territory/ Abuja Infrastructure Investment Center (AIIC)Small Hydropower Embedded Power from the Wupa Water Treatment Plant Effluent Discharge
Wupa Water Treatment Plant Project on a Build Operate and Transfer (BOT) PPP model to produce electric power from the effluent discharge from the plant. Power generation capacity is estimated at 3,346.29kW/day which would power the WWTP and also provide the input for the production of fertilizer and plastics.
The power plant is expected to sell excess power to the national grid.
Energy

Draft OBC sent by MDA and reviewed by the Commission August 8, 2017

Meeting held with project stakeholders on August 16, 2017

Development
49Federal Ministry of PowerConcession of 1.2MW Grid Connected PV Solar Power Plant
Concession of 1.2MW Grid Connected PV Solar Power Plant at Lower Usuma Dam, Abuja under the Japanese Grant-In-Aid to the FGN
EnergyOBC Certificate of Compliance was issued on 13th September, 2017.
An updated project Concept Note is being awaited from FMPW&H.
Development
50Federal Ministry of Petroleum ResourcesNNPC Refineries Rehabilitation Project
The project will involve the rehabilitation of refineries across the country.
Energy

A meeting took place between ICRC and an NNPC Team to discuss the Rehabilitation and PPPP O&M of Nigeria’s Refineries (Port-Harcourt, Warri and Kaduna) on                      6th July, 2020.

Virtual Bid Opening for EPC Contracts on Port-Harcourt Refinery took place on July 24, 2020.

Virtual Bid Opening for EPC Contacts on Warri and Kaduna Refineries took place on 25 August, 2020.

Development
51Federal Ministry of Petroleum ResourcesConstruction Of LPG And Ethanol/Methanol Plants At Emede Uzere Delta State (On Public Private Partnership (PPP) Basis)
The construction of an LPG and Ethanol/Methanol Plant at Emede Uzere, Delta State from Everlinksourcing Ltd to the Ministry of Petroleum Resources.   Identification of Public Private Partnership projects for Petroleum Equalization Fund,
EnergyProject site inspection was conducted by the Commission. Meeting with the management staff of PEF and ICRC on the 19th day of August. PEF yet to decide projects to be undertaken as PPPs.Procurement
52Federal Ministry of Power700 MW Zungeru Hydro Electric Power Plant.EnergyTechnical bid opening and evaluation for TA selection took place on June 23, 2021.Development
53Federal Ministry of Petroleum Resources/NNPCFMoP have sent concept notes to the Commission and are keen to develop the following projects;
i. Concession and development of 25MW Katsina Wind Farm
ii. Concession and development of 215MW Kaduna Power Plant
iii. Concession and development of 10MW lake Chad Basin Development Authority, Borno.
Concession and development of 1.2MW Solar facilities at Lower Usuma Dam.
EnergyThe Commission received concept notes on April 12, 2018. The Ministry has been requested to update the Concept Notes and engage a TA to assist with the process.Development
54Federal Ministry of Power University of Benin 15MW Solar Project (Unsolicited Proposal)
The project is a 15MW PV Solar power to be sited on a 30Hectare parcel of land at the University of Benin Ugbowo Campus.
Energy

OBC Certificate of Compliance was granted on March 19, 2018.

RFP evaluation exercise has been conducted by UNIBEN.
A virtual meeting was held between ICRC E&U Unit and UNIBEN project Team on the 3rd November 2020 to discuss critical dynamics of the project structure to ensure commercial close can be successful achieved.

UNIBEN Team is to revert with all the actionable steps discussed and agreed.

Development
55Federal Ministry of EducationDevelopment of Hydro power from Kiri DamEnergySettlement meeting in Suit No. FHC/ABJ/CS/110/2019 – Kiri Hydropower Ltd V. Minister, Federal Ministry of Water Resources & 5 Ors held on 14th Aug, 2019.
The Attorney General and Minister of Justice has issued a Legal Opinion for guidance vide a letter on 22nd July, 2020 on the Kiri suit.

At the meeting held with the Minister on May 17 2021, ICRC informed that this procurement should be conducted through a solicited process, hence the ministry should engage a transaction adviser to prepare OBC and Financial Model.

Development
56Federal Ministry of Water ResourcesSolar Power Off-Grid Rural Electrification
The project involves the provision of off-grid solar power to the remote rural communities in Taraba, Gombe, Niger, Kogi, Ebonyi, Oyo, Ogun, Edo, Akwa Ibom, Katsina and Kebbi states
EnergyThe Agency requested compliance certification for the OBC/FBC
Request for Proposal (RfP) has been sent to qualified bidder. Evaluation of the RFP has been concluded

Joint OBC/FBC compliance certificate was Revalidated 7th October 2020.

Procurement
57Federal Ministry of Power/ Electrification Agency40 MW Kashimbila Dam Hydropower Station
Kashimbila Dam is a 32m high composite dam with a 40 MW hydropower station located on the Katsina-Ala River, Taraba State, a tributary of the Benue River, approximately 20 km downstream of the Nigeria-Cameroon border. It comprises a zoned rockfill embankment with a central mass gravity ogee spillway, an outlet works which consist of multi-level intakes and outlet structure.
Energy

The Commission granted OBC Compliance Certification on October 15th, 2018.

Meeting between ICRC and the Transaction Adviser on the re-alignment of the items in the OBC to enable take-off of the project on April 19, 2021

PDT meeting took place on June 22, 2021 to discuss the RfQ publication.

Procurement
58Federal Ministry of PowerMakurdi Hydropower Project
The Makurdi Hydropower Project (Makurdi HPP) was originally conceived as part of the Plan for Electric Power System Development issued by the then National Electric Power Authority [NEPA] in 1974. The planned dam site is located on the Benue River, the primary tributary of the Niger River in Nigeria, about 10 ~ 15 km upstream of Makurdi, the capital of Benue State.
EnergyThe Commission granted OBC Compliance Certification on October 15th, 2018.Procurement
59Federal Ministry of PowerDevelopment of 136 MW Manya Hydropower Generation Facility, Taraba StateEnergy

OBC Certificate of Compliance granted on March 18th, 2019

The OBC compliance certificate was Revalidated 26th October 2020.

Procurement
60Federal Ministry of Water ResourcesDevelopment of 182 MW Bawarku Hydropower Generation, Benue StateEnergy

OBC Certificate of Compliance granted on March 18th, 2019

The OBC compliance certificate was Revalidated 26th October 2020.

Procurement
61Federal Ministry of Water ResourcesDevelopment of Hydroelectric power from existing 6 Small & Medium from dams across the Country
Federal Executive Council (FEC) gave an approval on the 30th November 2016 for 6 dams.
1. Bakolori Dam, Zamfara State
2. Omi - Kampe Dam, Kogi State
3. Doma Dam, Nasarawa State
4. Jibiya Dam, Katsina State
5. Zobe Dam, Katsina State
Ikere Gorge Dam, Oyo State
Energy

Ongoing finalization of the Concession Agreements between the Ministry and the Preferred Bidders for onward transmission to the Federal Ministry of Justice for vetting.

A meeting took place between ICRC, FMOP, and their Legal Advisers AELEX Partners on 27 August 2020 to discuss ICRC’s recommendations for Ikere Gorge, Omi Kampe, Bakalori and Zobe & Jibiya hydro power plant Concession Agreements

Procurement
62Federal Ministry of Power(Power)/ Federal Ministry of Water ResourcesDevelopment of Small, Medium and Large Hydropower Project Phase 2
Development of hydroelectric power from existing small, medium & large hydro dams in twelve (12) locations nationwide. As shown below:
Lot 3A
• 7MW Girmi Earth Hydropower Plant, Kaduna State (Brownfield)
• 1.2 MW Lower Usuma Hydropower Plant FCT (Brownfield)
• 9MW Oyan Hydropower Plant, Ogun State (Brownfield)
Lot 3B
• 138MW Dasin Hausa Hydropower Plant, Adamawa State (Greenfield)
• 40MW Kashimbilla Hydropower Plant, Taraba State (Brownfield)
• 92MW Garin Dalli Hydropower Plant, Benue State (Greenfield)
Lot 3C
• 182MW Bawarku Hydropower Plant, Benue State (Greenfield)
• 136MW Manya Hydropower Plant, Taraba State (Greenfield)
• 109MW Katsina Ala Hydropower Plant, Benue State (Greenfield)
Lot 3D
• 700MW Oguma Hydropower Plant, Kogie State (Greenfield)
• 1500MW Makurdi Hydropower Plant, Benue State (Greenfield)
• 441MW Onitsha Hydropower Plant, Anambra State (Greenfield)
EnergyThe preferred and reserve bidders’ TA list will be communicated to the Commission once all assessments have been finalized by FMoP.Development
63National Research Institute for Chemical TechnologyPyrolysis plant for the production of carbon black and diesel oilEnergyOBC has been reviewed prior to the meeting and a report has been sent. Meeting between ICRC and the technical team of NARICT was held on the 20th of August 2021 to discuss on the OBC. NARICT is meant to re-submit the OBC effecting the corrections.Development
64National Research Institute for Chemical TechnologyPlant for the production of polyester yarn from waste materialsEnergyOBC has been reviewed prior to the meeting and a report has been sent. Meeting between ICRC and the technical team of NARICT was held on the 20th of August 2021 to discuss on the OBC. NARICT is meant to re-submit the OBC effecting the corrections.Development
65National Research Institute for Chemical TechnologyPlant for the production of Bioplastic from biomassEnergyOBC has been reviewed prior to the meeting and a report has been sent. Meeting between ICRC and the technical team of NARICT was held on the 20th of August 2021 to discuss on the OBC. NARICT is meant to re-submit the OBC effecting the corrections.Development
66Petroleum Equalization FundIdentification of Public Private Partnership projectsEnergyMeeting with the management staff of PEF and ICRC on the 19th day of August. PEF yet to decide projects to be undertaken as PPPs.Development
67Federal  Ministry of Power Identification of PPP Projects for screening, prioritization and approval for procurement through PPP.
Signed Memorandum of Understanding for Potential areas of collaboration.
The following projects are under consideration:
i. Establishment of Federal Ministry of Environment’s Clean and Green Campaign to end open defecation in public areas by 2019 by providing Public Toilets nationwide. Pilots to be in FCT public schools, motor parks and market places; and extended to the 36 States.
ii. Framework for Plastic Industry and other private sector companies to take plastic waste off the streets by 2019
iii. Development of a New Head Office for the Federal Ministry of Environment (to be completed in 2018)
iv. Establishment of Scrap metal recycling facility, Sokoto, Sokoto State.
v. Establishment of Scrap metal recycling facility, Kaduna, Kaduna State.
vi. Establishment of Scrap metal recycling plant, Emuoha, Rivers State.
vii. Establishment of Scrap metal recycling plant, Owerri, Imo State.
viii. Establishment of Ozone village in Ikenne Ogun State.
ix. A pilot indigenous project to capture Biogas from faeces/ urine in Federal Government Girls Secondary School, Abaji, Abuja FCT
Development of Pilot Cotter Mitigation from lanfill for Energy production Wupa Lanfill, Wupa Village Abuja
EnvironmentMeeting held on 30th May, 2019 between Ministry of Environment and ICRC regarding pipeline projects submitted to the Commission in 2018 and the way forward for reviving PPPs within the Ministry.Development
68Federal Ministry of Environment (FMoE)Establishment of a Bamboo Value Chain
Establishment of a Bamboo Value Chain Business including maintaining, managing and scaling up the Bamboo factory in Lokoja, Kogi state
EnvironmentAwaiting the submission of an updated OBC by the Ministry.Development
69Federal Ministry of EnvironmentManagement Equipment Services (MES) project: To provide Medical Equipment and services in Government HospitalsHealthMeeting on MES sub-committee held on the 3rd and 29th of July 2019 review MES Concept noteDevelopment
70Federal Ministry of HealthConstruction of staff housing estate, shopping complex and new House Officers’ (Doctors') quartersHealthThe joint OBC/FBC is being reviewed for management approvalProcurement
71Federal Ministry of Health / University of Port Harcourt Teaching Hospital (UPTH)Abuja Medical Mall/City
This involves the development of a tertiary medical facility (Medical Mall/City) on a greenfield site in Abuja to harness the potential of the private health sector and provide high quality alternatives to Nigerians who require specialist medical care in the country.
HealthThe Ministry is in the process of procuring a Transaction Adviser to prepare an Outline Business Case to determine project viability and bankability.Development
72Federal Ministry of HealthDevelopment of Oncology Centre of Excellence for Cancer Care in 8 Teaching Hospitals across the Geopolitical zones Federal Ministry of Health
The FGN through the Federal Ministry of Health seeks to procure and manage Oncology equipment in Federal Teaching Hospitals across the Country.
HealthThe PDT has adopted the option of Traditional Procurement / Leasing where payment is tied to equipment management and service/the continuous function of the machine on service delivery.
Awaiting further steps from the Ministry.
Development
73Federal Ministry of HealthUpgrade of the 3rd Phase of Teaching Hospital Rehabilitation Project
The contracts for rehabilitation and modernization of select Federal Teaching Hospitals (8 in phase 1 and 6 in phase 2) were awarded in November 2002 and September 2006 respectively to VAMED Engineering Ltd and a Presidential Project Implementation Committee was set up to monitor proper and timely execution of the projects.
The remaining 7 Teaching hospitals were supposed to be rehabilitated and modernized through PPP and a Technical Working Group (TWG) with membership drawn from FMOH, NSIA, ICRC, and four members from private sector was set up to deliberate and agree with VAMED/CPL Group on the most suitable PPP model to be adopted for phase 3.
HealthOBC Certificate of Compliance was revalidated and re-issued to the Federal Ministry of Health on the 24th of August, 2020, for an accelerated negotiated PPP pilot scheme for six (6) teaching hospitals, one in each of the Nation’s geopolitical zones.Development
74Federal Ministry of HealthOrthopedic Hospital, Dala- Kano 
The proposed PPP seeks to construct staff quarters within the premises, conversion of existing bungalow within the hospital premises to commercial guest house, equipping of the Hospital mortuary building and Equipping, Furnishing and Operation of a Private wing of the Hospital.
HealthThe Ministry is in the process of procuring a Transaction Adviser to prepare an Outline Business Case to determine project viability and bankability.Development
75Federal Ministry of Health (FMoH)Establishment of Anti-Snake Venom Production Facility in Nigeria through PPP
The Ministry seeks the Establishment of Anti-Snake Venom Production Facility through PPP.
HealthInter-Ministerial Committee meeting held on 27th May, 2019 on proposed EDTV.
OBC report submitted on 12th October 2020, currently under review
Development
76Federal Ministry of Health\ Federal College of Education (Technical) Bichi, Kano State.Development of hostel facilities and supermarket
FCE Bichi (Technical) seeks guidance to develop hostel accommodation.
HealthThe submitted document has been reviewed and the College has been asked to submit additional documents.
The Commission is awaiting response from FCE Bichi.
Development
77University of Calabar Teaching Hospital. Federal Ministry of HealthStudents & Staff residential accommodation
Unsolicited proposal for the Design, Build, Manage and Transfer of Students & Staff residential accommodation within the Hospital premises on PPP arrangement (Proposed by PETROBARA).
HealthReview of Document in ProgressDevelopment
78Federal Ministry of HealthRadiotherapy and Oncology Centre and Operation of Oxygen Gas Plant at Aminu Kano Teaching Hospital, Kano
The management of Aminu Kano Teaching Hospital, kano wrote to the Honourable Minister proposing the implementation of the following projects through PPP: Establishment of Radiotherapy/Oncology Centre and Operation of Oxygen Gas Plant.
HealthA PDT meeting was held on September 12th, 2018.Development
79Federal Ministry of HealthDeployment of Thermal Health Scanners at the entry and exit points in Nigeria
In Compliance with International Health Regulations 2005 (IHR 2005) for the prevention and spread of diseases the Ministry of Health is desirous of deploying thermal health scanners at entry/exit points of the country.
HealthA PDT meeting was held on 5th July, 2019 to discuss issues raised by Federal Ministry of Finance on the OBC.Development
80Federal Ministry of HealthAbuja Healthcare City projectHealthPDT meeting held on 13th May 2019 to assess draft OBC.Development
81Federal Ministry of HealthNational Orthopaedic Hospital, EnuguHealthOBC Certificate of Compliance was withheld pending adjustments. Letter was dispatched on 20th July, 2020.Development
82Federal Ministry of Health/Usmanu Danfodio University, SokotoPublic Private Partnership Initiative on Pharmaceutical Products and Surgical Consumables and Diagnostic Laboratory Services Ii Usmanu Danfodio University Teaching Hospital, SokotoHealthThe Commission has reviewed the submitted document and advised the University to provide more information to confirm viability and bankability of the project.Development
83Federal Ministry of HealthDEVELOPMENT OF ADVANCED SURGERIES CENTRES IN NIGERIA GOVERNMENT HOSPITALS The Federal Ministry of Health, submitted an unsolicited proposal developed by LAANJ International Ltd, requesting the Federal Government to allocate specific departments in three Nigerian Public hospitals, one each in Abuja, Jos and Port Harcourt, where they can bring in experts from India at intervals to perform advanced surgeries. The proposal aimed to be established as an Operation and Management (O & M) Pubic Private Partnership (PPP) modelHealthReview of the OBC is ongoingDevelopment
84Federal capital Territory Administration / Abuja Properties Development Company APDCDevelopment of District Hospitals
Development of district hospitals in Wuye, Galadimawa and Lugbe Districts of the Federal Capital City.
HealthMeeting between ICRC and officials of the FCT Hospitals Management Board held on February 17th 2021 on commencement of the PPP for the development of the hospitals.Development
85Federal Ministry of HealthMEMORANDUM OF UNDERSTANDING FOR THE PUBLIC PRIVATE PARTNERSHIP ON MEDICAL LABORATORY DIAGNOSTIC SERVICES AT THEAHMADU BELLO UNIVERSITY TEACHING HOSPITAL, ZARIA (ABUTH, ZARIA).
Federal Ministry of Health submitted an unsolicited proposal requesting the ABUTH Zaria to allocate space, electricity, water and security. While DNA LABS will supply all equipment and provide efficient Lab services in the following areas:
i. Chemical Pathology
ii. Immunology
iii. Microbiology
iv. Hematology
v. Forensics
vi. Molecular Diagnostics

The Medical Laboratory Diagnostics Services is proposed to be established as a Supply, Operate and Management Pubic Private Partnership (PPP) which aims at making huge improvement in the quality-of-service delivery and earning capacity of the Hospital.

HealthThe Commission has reviewed the document and advised the Ministry to provide more information to confirm viability and bankability of the project.Development
86Federal Ministry of InteriorDevelopment of Advanced Passenger Information API, and Passenger Name Record PNR Portals
The Nigeria Immigration Service (NIS) through the Ministry of Interior are developing an Advanced Passenger Information API, and Passenger Name record PNR portals.
ICTICRC attended the bid opening for the engagement of a Transaction Adviser for the project on January 28, 2019.
Evaluation for the engagement of TA took place from March 22nd - 27th, 2019.
Development
87National Lottery Regulatory Commission/ National Lottery Trust FundDeployment of Central Management System Platform
The National Lottery Regulatory Commission/ National Lottery Trust Fund are seeking to deploy of Central Management System Platform
ICT

RFP Bid evaluations have taken place for selection of a Transaction Adviser on the project.

Negotiations are ongoing between the PDT and preferred TA bidder

Development
88Federal Fire ServiceDevelopment of National Fire Data Repository Center (NFDRC)
The project involves the upgrade, rehabilitation, operation and maintenance of the NFDRC Enterprise Unit through a PPP arrangement that provides an ICT-based system to ensures speedy detection and rapid response to fire emergencies in a self-funding and sustainable manner.
The project will cover the design and development of the NFDRC systems.
ICT

The Commission granted an OBC Compliance Certificate on 5th of November 2018

The Service submitted RfP bid documents to the Commission for guidance on May 2019.

ICRC to advise FFS once review is complete.
Full Business Case (FBC) certificate issued on June 21, 2021
FBC certificate of compliance issued on June 21, 2021

Development
89Federal Fire Service/ Federal Ministry of InteriorSAFETY SYSTEMS NETWORKING, MONITORING AND DISPATCHER REAL-TIME INTEGRATION SYSTEM (LSSNMDI)ICTOBC submitted and is under review
OBC certificate of compliance issued on June 21, 2021
Development
90Federal Ministry of Finance, Budget and National PlanningDevelopment, deployment and management of Automated Customs Gateway Portal for Import Duty Exemption Certificate (IDEC) and Imported Vehicle identification Number Registration (VREG)ICT

FBC Certificate has been issued and presented on 22nd May, 2019

The Commission revalidated the Full Business Case (FBC) Compliance Certificate on 29th November, 2019.

Procurement
91Federal Ministry of JusticeCriminal Justice Management Information System (CJMIS)
The Federal Ministry of Justice (FMoJ) has received an Unsolicited Proposal from ECR Technology Services Limited (ECR) seeking to utilize the application of a Criminal Justice Management Information System (CJMIS) that will enable the achievement of an economically viable way of implementing the Criminal Justice Act (2015).
ICTThe Commission advised the Ministry through a letter on March 27th, 2018 to commence a 2-Stage competitive bidding in accordance to ICRC guidelines.
The Commission received a revised OBC from the Federal ministry of Justice on September 2020 and is currently under review.
An OBC certificate was issued on November 4, 2020 for the pilot phase of the project
 
92Federal Ministry of Industry, Trade & Investment (FMITI)Digital Industry Trade and Investment Platform (DITIP)ICTA letter dated 30th June, 2021 was sent to the Ministry advising the Ministry to provide more information to confirm viability and bankability of the project.Development
93National Communications CommissionDeployment of a Centralized Device Management System (DMS)
The procurement of Device Management Solutions (DMS) to combat counterfeit and sub-standard ICT devises in Nigeria.
ICT / Communications1. Engagement of TA has been concluded.
2. A presentation was made to the newly implemented PPP Unit on PPPs
3. An introductory meeting was held with the PPP Unit on the way forward regarding the Unit.
Procurement
94National Communications CommissionDeployment of a Revenue Assurance System (RMS)
The procurement of Revenue Assurance (RAS) to combat revenue leakages amounting to N1Trillion naira annually in the telecoms market generally.
ICT / Communications

Engagement of Individual Consultants namely; PPP Expert and PPP Financial Modeller has been concluded.

A PDT meeting was held to explore swift ways of regularizing the project and concluding negotiations with the preferred bidder which emerged under the PPA 2007 governance framework to enable the preparation of an FBC and draft PPP Agreement for ICRC’s review and compliance certification.

OBC for the deployment of a Revenue Assurance System (RAS) is being reviewed and awaiting issuance of Certificate. A PPP expert and Financial Modeler have been engaged to help with the process
Draft copy of the FBC was forwarded to ICRC in May 2021

FBC review meeting by PDT and legal experts took place on June 9, 2021.

Procurement
95National Space Research & Development Agency (NASRDA)

Research and Development of Satellite Technology and Equipment for the Provision of cost-effective satellite broadband to rural Nigeria.

 

ICT / Communications

OBC certificate issued on June 22, 2021

PDT inaugurated on July 8, 2021. RFQ advert published on July 22nd 2021 with an August 19 deadline                                                                                                          Review of draft RfP documents ongoing.

Development
96National Space Research & Development Agency (NASRDA)Concession of Planetarium and Museum
The project seeks to equip, operate and maintain the Planetarium and Museum at the Obasanjo Space Centre Abuja.
ICT / CommunicationsOBC submitted on June 9, 2021. Currently under review
OBC Certificate of Compliance issued on July 13, 2021

RfQ for the Swiss Challenge process was published on August 27, 2021

RfQ Bids closed on September 22, 2021 and evaluation took place on September 30, 2021

Development
97Federal Ministry of Industry, Trade & InvestmentDevelopment of SME Portal
A technology enabled platform project that will encourage more MSMEs to be attracted into the formal sector.
The project is currently in Development Phase.
Industry, Trade and InvestmentFBC Certificate of Compliance was issued on the 26th April, 2019.
FEC has approved the FBC certificate
Procurement
98Federal Ministry of Industry, Trade and InvestmentDevelopment of Okerete Transnational Border Market at Saki West LGA, Oyo State
The Ministry intends to establish transnational border markets to promote regional integration, create employment in rural areas and reduce high incidence of smuggling across Nigeria’s borders. The intention is to create them at 6 geo-political zones of the country starting with Okerete, in South West region.
Industry, Trade and InvestmentThe Ministry is in the process of procuring a Transaction Adviser to prepare an Outline Business Case to determine project viability and bankability.
It was unanimously agreed at the Technical Committee meeting that the road leading to the site should be graded and tarred as well as include the construction of a bridge that will link Nigeria and the Republic of Benin.
Development
99Federal Ministry of Industry, Trade & Investment and Niger StateBabanna Transnational Border & Regional Market Project
Integration of informal trade with the formal sector, Elimination of smuggling, Revenue generation, Enhancement of bilateral integration and trade, Enhancement of security along the border are all aspects of this Transnational border project.
Industry, Trade and InvestmentA Technical Committee meeting held on 23rd January, 2020 to chart a way forward for the project.
The meeting agreed to develop a TOR for the engagement of TA on the project.
Development
100Federal Ministry of Petroleum  Resources & NNPCRehabilitation of NNPC Pipelines Network and Storage Facilities Under a BOT ModelPetroleum/ Energy

The project has been submitted by NNPC providing a Business Case for the BOT Model for the rehabilitation of the NNPC’s pipeline Network and Storage Facilities. Evaluations REOI/RfQ ongoing, which commenced on September 24, 2020

PDT meeting held weekly in the month of May 2021 on Fridays
OBC Certificate of Compliance issued on July 22, 2021                                             Awaiting the issuance of RfP to pre-qualified bidders expected before the end of September 2021

Development
101Nigerian Shippers’ CouncilDevelopment of Ibadan Inland Dry Port (IDP) under PPP Model
The Nigerian Shippers’ Council (NSC) in pursuit of its function of facilitating trade and protection of cargo interest in all transport modes and its mandate as the economic port regulator is promoting the development of Ibadan Inland Dry Port (IIDP) in Ibadan, Oyo State under PPP arrangement. The NSC in partnership with Oyo State Government intend to enter into joint-venture PPP with a top tier private sector partner to establish an Inland Dry Port at Olorisaoko on the Iseyin-Ibadan road, Ibadan, Oyo State.
Port/ICD

PDT meeting was held on 9th of January, 2020 at the FMoT to deliberate on the TAs comments on the draft FBC report prepared by CRCC Construction Company Limited, review the status of the project and identify project challenges and proffer possible solutions.

Meeting held between NSC, ICRC and Transaction Adviser (TA) on 5th June, 2020 to review some of the contentious issues in both the Full Business Case (FBC) and the Concession Agreement (CA) with view at arriving at a common position during the negotiation.

Next steps:

• Conclusion and forwarding of FBC report to the Commission for issuance of compliance certificate.
• FEC approval
• Commercial Close
• Financial Close

Development
102Federal Ministry of Transportation / Nigeria Shippers Council (NSC)The Dagbolu Inland Container Depot (ICD):
(Solicited Proposal) The project concerns the development of a Greenfield ICD in Osun State, South-West Nigeria. The ICD is being developed to exploit the strategic advantages in Nigeria's huge export and import market by making the country a trans-shipment hub for the West African region. The ICD when developed would provide storage and cargo handling facilities for export and import of containerized cargos to and from the hinterland of Nigeria especially around the Southwest states of Ondo, Ekiti, Osun; Edo State and Kwara State.
Ports SectorThe Commission reviewed the RFP and approved it for NSC to issue to the prequalified bidders.Procurement
103Federal Ministry of Transportation / Nigeria Shippers Council (NSC)Development of Inland Container Depot (ICD) in Lolo, Kebbi State:
(Unsolicited Proposal):
The FGN, as part of the Economic Reform Programme, approved the setting up of Lolo Inland Container Depots (ICD) to provide port services to shippers.
Outline Business Case (OBC) received from the Nigeria Shippers Council (NSC) in respect of the unsolicited proposal developed by Deltatlantic Nigeria Ltd.
'
Ports Sector

The Commission re-issued an OBC Certificate November 8, 2017.

Next step:
Due diligence and negotiation with the preferred concessionaire, Deltatlantic Nigeria Limited.

Procurement
104Federal Ministry of Transportation / Nigeria Shippers Council (NSC)Development of Inland Container Depot (ICD) in Onitsha, Anambra State: This has a design that consists of an annual 5,000 TEUs capacity facility which can be expanded with increasing throughout.Ports SectorThe Commission issued an OBC Certificate November 8, 2017.
Next step:
Advertisement in the print media for the selection of preferred concessionaire.
Procurement
105Federal Ministry of Transportation (FMoT)/ National Inland Waterways Authority (NIWA)Onitsha River Port Concession
(Solicited Proposal): The FGN adopted PPP arrangements to develop four river ports in the Lower Niger, namely:
i. Onitsha
ii. Lokoja
iii. Baro and
iv. Oguta River Ports.
Onitsha River Port was selected as the pilot case. The World Bank is sponsoring the project development and procurement phases for the Inland Port Concession.
Ports Sector

Negotiations with preferred bidder (Universal Elysium Consortium) are ongoing.


The Commission issued Full Business Case Certificate of Compliance to NIWA on 23rd August, 2021.

Next Step:
FEC approval of the FBC

Procurement
106Federal Ministry of Transportation / Akwa Ibom State GovernmentIbom Deep Sea Port Project
(Solicited Proposal): The Ibom Deep Sea Port (IDSP) project involves the development of a Greenfield Deepsea Port and accompanying Free Trade Zone (FTZ) in Akwa Ibom State in the South-South geopolitical zone of Nigeria. The proposed Port and FTZ are part of the proposed Ibom Industrial City initiative that will be established on a 14,400-hectare site donated by the Akwa Ibom State Government (AKSG) at no value. The IDSP project is intended to become a major national and regional economic gateway that will provide additional container handling capacity for the country. In addition to containers, the IDSP is expected to handle petroleum products (export and import), crude oil and natural gas (export), vehicles (import) and bulk trade in natural resources (import and export).
It is planned to be the deepest port in the West African sub-region.
Ports Sector

Preliminary negotiation meeting with the preferred bidder, (Bollore/Power China Consortium) was done on January 9th, 2020 in Lagos.

The Commission Revalidated the Full Business Compliance certificate to the FMoT/NPA on 12th Feb, 2020

After expiration of certificate, the Commission once again revalidated and re-issued FBC certificate on 17th September, 2020 with 6 months validity.

FEC approved the FBC on 16th December

Next Steps:
Commercial Close
Financial Close

Procurement
107Federal Ministry of Transportation (FMoT) / Nigeria Ports Authority (NPA)Kirikiri Port Lighter Terminal I & II
(Solicited Proposal): The Federal Government aims to procure concessionaires to rehabilitate and upgrade these terminals which were hitherto selected as fishing terminals.  The project development and procurement costs are being sponsored under International Development Association (IDA) Credit to the Federal Government of Nigeria for PPP support.

Project Structure:
A landlord approach (BOT) proposed as applied to the existing terminals concession embarked upon in 2005/2006
20-Year concession tenor through an SPV with NPA as landlord.

Ports Sector

The Financial bids for KLT II was opened and Tin Can Inland Container Terminal Limited (TICT) emerged as the preferred bidder.

Project Closeout & Negotiation with TICT for Kirikiri Lighter Terminals took place 11th – 14th June, 2018.

Next Step:

Conclusion of Negotiation with preferred bidder and submission of FBC to ICRC and FEC for approval.

Procurement
108Federal Ministry of Transportation/ Nigerian Ports Authority The Development of Deep Sea Port in Badagry, Lagos
The project is a Greenfield development designed to cater for containers, dry bulk, liquids, Ro-Ro, oil & gas products, and also operate a free trade and local logistic zones.
Ports Sector

FEC approval for OBC has been obtained.

Next step: NPA is in the process of procuring a Transaction Adviser to guide the concessionaire.

Procurement
109Federal Ministry of Transportation/Cross River State Government (CRSG)The Development of the Bakassi Deep Sea Port
The Cross River State Government intends to develop a sea port at Bakassi under a PPP arrangement, in pursuance of which it sought the collaboration of the Federal Government of Nigeria in accordance with existing legal framework for port development in implementing the proposal.
Ports Sector

Outline Business Case Certificate of Compliance was granted for the project on 25th September,2019 to enable the project to proceed to procurement phase.

Request for Qualification (RfQ) was advertised in the print media on 1st February, 2021 seeking proposal form investors for the Design, Build, Finance, Operate and Transfer (DBFOT) of the Bakassi Integrated Deep Seaport and Calabar-Ogoja-Gakem Super Highway.

Next Step:

Submission of RfQ proposals by interested investors and evaluation of proposals.

Issuance of Request for Proposal (RfP) to qualified investors

Procurement
110Federal Ministry of Transportation / NPAPort Single Window
The project involves the introduction of electronic single window platform that can effectively coordinate all port related/cargo clearance activities capable of potentially transforming port operations to a seamless, paperless system by eliminating redundant procedures and duplications.
Ports SectorThe Ministry is in the process of procuring a Transaction Adviser (TA) to prepare an Outline Business Case to determine the project’s viability and bankability.
Next step:
Awaiting procurement of TA and preparation of OBC
Development
111Federal Ministry of Transportation / NPANational Freight Intelligence and Transportation Hub (NAFITH)
The project involves an application of information and communications technology (ICT) in the management of transport problems. It seeks to leverage on new innovation to provide needed solutions to the teething transport problems in Apapa.
Ports SectorThe Ministry is in the process of procuring a Transaction Adviser (TA) to prepare an Outline Business Case to determine the project’s viability and bankability.
Next step:
Awaiting procurement of TA and preparation of OBC
Development
112Federal Ministry of Transportation / NPAKoko Port Concession
FGN is seeking to grant a new Concession over the Koko Port in 2017. NPA is conducting hydrographic studies to determine the best way the channels leading to Koko port could be optimally utilized. The transaction described herein will consist of the contiguous NPA lands and NPA facilities between the river and the public roadway that runs behind the port property and including the area behind the existing quay. The transaction for this general cargo port will consist of a 180 m quay and apron, and a transit shed.
A plan view of the Koko Terminal lease will consist of the following facilities:
A 175 m long quay and apron;
• Additional waterfront for future expansion;
• A five-bay transit shed;
• The port administrative buildings and entrance gate;
• Port support buildings including the fire station, security police building, the power station with backup generator, and the maintenance shops; and
• A disused warehouse and miscellaneous buildings behind the quay area, and all other lands and buildings inside the Koko Port perimeter.
Not included in this transaction are the jetty and other facilities or equipment currently used by Tower Petroleum for bulk liquid (bitumen) handling.
Ports SectorThe NPA is in the process of procuring a Transaction Adviser (TA) to prepare an Outline Business Case to determine the project’s viability and bankability.
Next Step:
Awaiting procurement of TA and preparation of OBC
Development
113Federal Ministry of Transportation / (NPA)Ikorodu Lighter Terminals
The port is dedicated to salvaging unclaimed or overtime containers in the ports, with a view to providing needed solutions to port congestions and pave way to smoothen the new concessionaire’s operations in the ports.
Ports SectorThe Ministry is in the process of procuring a Transaction Adviser (TA) to prepare an Outline Business Case to determine the project’s viability and bankability.
Next Step:
Awaiting procurement of TA and preparation of OBC
Development
114Federal Ministry of Transportation / (NPA)Provision of Utilities to the Ports
The FGN is desirous in using PPP procurement method for the provision of utilities to the ports. These include, but are not limited to the provisions of power and water.
Ports SectorThe Ministry is in the process of procuring a Transaction Adviser (TA) to prepare an Outline Business Case to determine the project’s viability and bankability.
Next Step:
Awaiting procurement of TA and preparation of OBC
Development
115Federal Ministry of Transportation / (NIMASA)i. Ship building yard with breaking, recycling technology and wreck identification and removal.
ii. Management and operations of the modular/floating dry dock (outsourcing).
iii. Procurement of operational vessels, maritime patrol aircraft, coordination/surveillance centre and other operational equipment (Finance lease)
iv. Outsourcing of NIMASA’s Training Centre and Guest House at Nigerian Maritime Resource Development Centre (NMRDC), Kirikiri, Lagos state.
v. PPPs to develop a Multilevel car park at NIMASA Headquarters
vi. Unsolicited proposal for Development of platform for pollution
Verification Gross Mass Imo Solar- safety of life at sea
Ports Sector

The Ministry is in the process of procuring a Transaction Advisers to prepare an Outline Business Case to determine the project’s viability and bankability.

Next Step:
Awaiting procurement of TA and preparation of OBC

Development
116Federal Ministry of Transportation (FMoT)/ National Inland Waterways Authority (NIWA)PPPs for the following facilities:
i. Warri Dockyard
ii. Lokoja Dockyard
iii. Concession of Abam Ama Jetty at Port Harcourt
iv. Buoyage Vessels (B/V Anam at Onitsha)
v. Buoyage Vessels (B/V Bajibo at Lokoja, Kogi State)
vi. Buoyage Vessels (B/V Nembe at Lokoja, Kogi State)
vii. Buoyage Vessels (B/V Numan at Lokoja, Kogi State)
viii. Motor Ferry (M/F Calabar at Lokoja, Kogi State)
ix. Motor Ferry (M/F Effiat Mbo at Lokoja, Kogi State)
x. Motor Ferry (M/F Donga at Makurdi, Benue State)
xi. Water Bus (W/B) at Yauri, Kebbi State
xii. 3 Nos. 40-45 Passenger Sitter Ferries at Lokoja, Kogi State
xiii. Water Hyacinth Clearing Equipment (Water Master Classic III at Onitsha)
xiv. 2 Nos. 40-45 Passenger Sitter Ferries at Lagos
xv. Marina Jetty at Lagos
xvi. Apapa Jetty at Lagos
xvii. Oyingbo Jetty at Lagos
xviii. Maraoko Jetty at Lagos
xix. Abayomi Drive Jetty at Lagos
xx. Osborne Jetty at Lagos
Calabar Jetty at Calabar
Ports Sector

The Ministry is in the process of procuring Transaction Advisers (TAs) to prepare an Outline Business Case to determine the projects’ viability and bankability.

Next Step:
Awaiting procurement of TA and preparation of OBC

Development
117Federal Ministry of Transportation / Nigeria Shippers Council (NSC)Development of Inland Container Depot (ICD) in Benin, Edo State
The Benin Dry Port is proposed to act as a port of destination for container cargoes waiting for further delivery instructions.  It is also proposed to provide services for the unloading of full container loads and breaking them down into smaller lots per consignee.
The primary objective of establishing the BENIN DRY PORT is to provide a one stop cargo reception and clearance facility to boost exports from and imports into Edo State particularly and Nigeria’s South-South, South East and some States in the Middle Belt regions in general. It is expected to provide proper handling and logistics services which emphasize promptness, dependability and cost effectiveness.
Ports SectorThe Commission has written to the NSC on 26th Oct. 2018 and give its support for the project to be implemented under the following guidelines:
• NSC to give all necessary permits for the operation of the facility as an inland Dry Port
• NSC to seek all necessary Ministerial approvals and set a date for negotiation
Next step:
According to the NSC, there is need to conduct Gap-Analysis with a view of advising the proponent on the steps to be taken before declaring the project as port of Origin and port of Destination.
Development
118Federal Ministry of Transportation / Nigeria Shippers Council (NSC)Development of Vehicle Transit Area (VTA) in Obollo-Afor, Enugu State
The NSC proposes to facilitate the development of VTAs through PPP with facilities for short-term breaks as well as long-term parking services where truck drivers can get fuel, food, restrooms, showers and basic supplies like oil and spare parts as well as servicing and repairs of haulage vehicles. The VTAs will have the following facilities including but not limited Gas Station, Hotel and Motel, Restaurants, Mechanic Workshop, Fire Station, Police Post, Automated Cargo Tracking System.
Ports Sector

Catamaran Nigeria Limited has been appointed as Transaction Adviser.

OBC Certificate of Compliance was issued for the proposed project on 15th August, 2018

The commission received RFQ, RfP and Information Memorandum on December 20th, 2018 which has been reviewed and certified.

Upon expiration of certificate, NSC forwarded revised/update OBC to the Commission for recertification.

The Commission revalidated the OBC 15th February, 2021.

Next Step: Process leading to the selection of concessionaire.

Procurement
119Federal Ministry of Transportation / Nigeria Shippers Council (NSC)Development of Vehicle Transit Area (VTA) in Lokoja, Kogi State
The NSC proposes to facilitate the development of VTAs through PPP with facilities for short-term breaks and also long-term parking services where truck drivers can get fuel, food, restrooms, showers and basic supplies like oil and spare parts as well as servicing and repairs of haulage vehicles. The VTA will have the following facilities including but not limited to Gas Station, Hotel and Motel, Restaurants, Mechanic Workshop, Fire Station, Police Post, Automated Cargo Tracking System.
Ports Sector

Halcrow Infrastructure Consortium appointed as Transaction Adviser.

OBC Certificate of Compliance was issued for the proposed project on 24th October, 2018

Next Step:
Commencement of procurement process for the selection of concessionaire.
The Commission after review of updated OBC report revalidated the OBC 24th June, 2021

Next Step:
Commencement of procurement process for the selection of concessionaire.

Procurement
120Federal Ministry of Transport/Nigerian Ports AuthorityThe Rehabilitation and Expansion of the Burutu Port
Burutu Port is located in Burutu Local Government Area of Delta State. The current Port is on a 40.716 Hectares of Land and was originally built as a logistic Port for the export of Solid minerals and Agricultural Produce as well as importation and transportation of foreign goods from Europe for onward movement to the hinterland River Ports via the inland waterways
Ports Sector

The Commission issued Outline Business Compliance Certificate (OBC) to the NPA on 28th November, 2019 to enable the project proceeds to the PPP procurement phase.

Upon expiration of OBC certificate, NPA resubmitted and updated OBC for recertification.

The Commission revalidated the updated OBC on 1st February, 2021

Next step:
Advertisement in the print media for the selection of preferred concessionaire.

Site visit to the Burutu port project took place 28th-30th July, 2021

Next step:
Taking the project through Modified Swiss Challenge

Procurement
121Federal Ministry of Transportation (FMoT)Development of Bonny Deep Water Port
The FGN intends to develop the Bonny Deep Water Port through PPP arrangements in order to improve transportation opportunities and boost economic activities along south-south, south east, north central and north east geo-political economic corridors and ease pressure on the western ports – Apapa and Tin Can Island which at the moment handles about 90% of cargo throughput in the country.
Ports Sector

The Commission granted the OBC Compliance Certificate on 22nd June, 2020; and granted the FBC Compliance Certificate on 24th August, 2020

FEC approved by the FBC on 7th October, 2020

Next Step:
• Commercial Close
• Financial Close

Procurement
122Federal Ministry of Transportation (FMoT)/ National Inland Waterways Authority (NIWA)Re-development of NIWA Marina Land, Lagos State
The project involves the re-development of a narrow strip land measuring 3.9 hectares with plans to reclaim 39.2 hectares to a total of 41.1 hectares in Marina, Lagos; both the land and water areas are under the jurisdiction of the National Inland Waterways Authority (NIWA). The facility is currently being used for berthing and docking of passengers’ boats and other vessel services referred to as “marina land”.
Ports Sector

The Commission reviewed and granted the OBC Compliance Certificate to the Honourable Minster of Transportation on 29th December, 2020.

Next Step:
Commencement of procurement process for the selection of concessionaire.

Procurement
123Federal Ministry of Transportation / (NIMASA)

Management Contract to Operate, Maintain and Transfer (OMT) of NIMASA Floating Dry Dock, Lagos

The concessionaire is to seek a management contract for the Management and Operations of the Modular/Floating Dry Dock to assist to put in place a Project Management Company for the Outsourcing of the operation and management of its Floating Dry Dock (FDD) through a competitive bidding process as technical partners on a commercial basis.

The NIMASA Modular Dry-Dock for the dry-docking of all possible vessels, including tugs supply vessels, fishing vessels and normal vessels has the following dimensions:

• Length over all – 110 m.
• Beam: 30.2m external.
• Depth: 12m
• Vessels draught docking capacity: 6m.
• Dry-dock lifting capacity: 5000 ton

Ports SectorThe Commission issued NIMASA an Outline Business Case Compliance Certificate on 3rd March, 2021 and therefore advice that the project proceeds to procurement phase that would lead to emergence of a preferred operator.Procurement
124Federal Ministry of Transportation / (NIMASA)

Offshore Waste Reception Facility (OWRF) by Nigerian Maritime Administration and safety Agency (NIMASA)

In line with NIMASA’s vision, the Agency attempted to address the issue of setting up Offshore Reception Facilities between 2007 and 2012 but was unsuccessful in the absence of regulations to back any proposals for the establishment of the facilities. Irrespective of the introduction of these new regulations, NIMASA has not been able to actualize its obligations of MARPOL 73/78 due to economic and budgetary challenges, hence the agency’s effort in sourcing the PPP procurement option. There’s currently no established OWRF to meet the needs of ships visiting offshore terminals

Ports SectorThe Commission issued NIMASA an Outline Business Case Compliance Certificate on 3rd September, 2021 and therefore advice that the project proceeds to procurement phase that would lead to emergence of a preferred operator.Procurement
124Federal Ministry of Transportation/ Nigerian Railway Corporation Greenfield Railway Lines across Nigeria
• Lagos – Shagamu- Ijebu Ode- Ore- Benin City (300km) (standard gauge)
• Benin- Agbor-Ogwashi Uku- Asaba- Onitsha –Nnewi- Owerri-Aba with additional line from Onitsha-Enugu- Abakaliki (500km) (standard gauge)
• Ajaokuta(Eganyi)-Obajana-Jakura-Baro-Abuja with additional line from Ajaokuta- Otukpo(533km) (standard gauge)
• Zaria- Funtua- Tsafe- Gusau- Kaura- Namoda-Sokoto-Illela-Birnin Koni (520Km) (standard gauge)
• Lagos –Ibadan- Oshogbo-Baro-Abuja (615KM) (high speed).
Rail

The OBCs on these projects are being awaited.

Next step:
Awaiting procurement of TA and preparation of OBC

Development
125Federal Ministry of TransportationProvision Of Enterprise Resource Planning (ERP) Solution for the Council for Regulation of Freight Forwarding in Nigeria (CRFFN)
The Council for the Regulation of Freight Forwarding in Nigeria Act No. 16 of 2007 was enacted into law on April 30, 2007. The Council is charged with, amongst other responsibilities, regulating and controlling the practice of Freight Forwarding in Nigeria, and promoting the highest standards of competence, practice and conduct among members of the profession.

Given the challenges experienced in managing the existing platform and the need for the Federal Government to ensure that Freight Forwarders comply with law and that Terminal Operators take certificates issued by CRFFN as part of import clearing documents; the SW Global (SWG) Platform is being procured on a PPP basis to enhance efficiency by the Nigerian Ports Authority (NPA), Nigeria Customs Service (NCS) and Nigerian Civil Aviation Authority (NCAA) for transparency and prompt service delivery aimed at generating revenue for the Government.

Rail

Full Business Case submitted by CRFFN, reviewed and certificate of compliance issued 12th February, 2019 for the Design, Build, Operate and Transfer (DBOT) of an Enterprise Resource Planning Solution under a PPP arrangement with Messrs SW Global (SWG) as the Preferred PPP partner based on their old service provision performance.

Next Step: Submission of FBC to FEC for approval

Procurement
126Federal Ministry of Transportation/ Nigerian Railway Corporation

Design, Development, Deployment and Management of a Secure Automated Fare Collection (AFC) Solution for the Nigerian Railway Corporation (NRC) Rail Network.

Given the challenges experienced in managing the existing platform of Nigeria Railway and the need for Nigeria Railway Corporation (NRC) to mitigate leakages in ticketing and collection of revenue and the possible automation to enhance efficiency for NCR by deploying the technology and human capital through a portal to established transparency and prompt service delivery aimed at generating revenue for NRC

Rail

FEC has approved FBC Compliance Certificate for the proposed project on 29th January, 2020

Concession Agreement (CA) finalized and signed 18th November, 2020.

ICRC has taken Custody of the CA (January, 2021)

Implementation
127Federal Ministry of Transportation (FMoT)

Development of Railway Industrial Park in Port Harcourt

The FGN intends to develop a Railway Industrial Park in Ubima, Rivers State through PPP arrangements with the following facility components for commercial vehicles and rolling stock assembly, Oil and Gas materials supply Industrial Park, Textile Industrial Park, Light Industry Park for Fast Moving Commodities and Goods (FMCGs).

Rail

The Commission granted the OBC Compliance Certificate on 22nd June, 2020; and also granted the FBC Compliance Certificate on 24th August, 2020.

FEC approved the FBC on 7th October, 2020

Next Step:
• Commercial Close
• Financial Close

Procurement
128Federal Ministry of Transport/ Nigerian Railway Corporation

THE DEVELOPMENT OF ABUJA-BARO-ITAKPE-AJAOKUTA-WARRI RAILWAY LINE (269.12KM) WITH BRANCH LINE AND EXTENSIONS FROM JAKURA-LOKOJA (41KM) AND AGBARHO-WARRI (5KM) AND WARRI NEW SEAPORT

The 2-projects are:
i. Abuja-Baro-Itakpe-Ajaokuta-Warri Railway Line (269.12km) with branch and extension lines to Jakura-Lokoja (41km) and Agbarho-Warri (5km)

ii. Development of Warri new Seaport, Warri, Delta State

The preferred PPP project model is Design-Build-Operate and Transfer (DBOT) model where CRCC will recoup its investments through user-fees. The proposed projects were designed to promote passenger and freight services, promote regional infrastructure development, preserve the life span of roads, encourage inter-model transport system, job creation and promote economic recovery and growth plans of the Federal Government, etc.

Rail/ Port

Messrs. China Railway Construction Company International (CRCC(I)) was competitively procured to develop these projects under a PPP arrangement.

Process included joint due diligence on the CRCC(I) offices in China by ICRC, FMOT, Federal Ministry of Finance, Nigerian Railway Corporation to confirm technical and financial capabilities to undertake the Project

ICRC issued FBC Compliance Certificate on 27th November, 2018

FEC approval of FBC obtained 2018
Incorporation of Special Purpose Vehicle for the project commenced in October 2020

Procurement
129Federal Capital Territory (FCT), Abuja. FCTAONEX through Mpape-Gurku-Ado/Gurku-Nyanya in the Federal Capital Territory (FCT), Abuja. FCTA
The project involves the construction, operation and maintenance of Dual Carriage way from Outer Northern Express Way (Murtala Mohammed Way) through Mpape to Gurku, through Ado/Gurku.  The project was designed to ease congestion on Nyanya road and its surrounding axis.
RoadThe project is at development phase involving procurement of Transaction Adviser and preparation of Outline Business CaseDevelopment
130Federal Ministry of Works & Housing (FMW&H)Development Of Abuja-Ibadan Expressway Project (Unsolicited by TIB & AEC Group)
The proposed PPP project entails the development of new road corridor from Lagos/Ibadan to Abuja covering a distance of about 480 km.

The proposed road will originate from Lagos/Ibadan axis and traverse Kwara, Osun, Kogi, Niger, and terminates in FCT.
The proposed project is designed to drastically reduce travel time between Lagos/Ibadan and Abuja.

Roads & BridgesAEC Group Limited, China Harbour Engineering Company Limited and TIB Consortium individually submitted unsolicited business proposals to the FMW&H for consideration
FMW&H transmitted the unsolicited proposals to ICRC for review and regulatory guidance
ICRC reviewed OBCs and recommended that the three proponents harmonize and come up with a single proposal
After series of interfaces between the three proponents, they failed to reach an agreement on a single proposal
The ICRC recommended to the FMPW&H that the project be subjected to Swiss Challenge or Government compensate TIB for first approaching the Ministry with the proposal
Next Step
Awaiting the Ministry’s further action on the project based on ICRC regulatory guidance.
Procurement
131Federal Ministry of Works & Housing (FMW&H)Concession of 10 roads under the Highway Development & Management Initiative (HDMI)
1. Asaba-Agbor (Delta/Edo States)
2. Abuja-Lokoja (FCT/Kogi)
3. Kano-Katsina (Kano/Katsina)
4. Onitsha-Aba (Ananbra/Abia)
5. Shagamu-Benin (Ogun/Edo)
6. Abuja-Akwanga (FCT/Nasarawa)
7a. Kano-Shuari [lot 1] (Kano State);
7b.       Potiskum-Damaturu [lot 2] (Yobe State)
8. Lokoja-Auchi (Kogi/Edo)
9. Enugu-Port Harcourt (Enugu/Rivers)
10. Ilorin-Jebba (Kwara/Niger)
11. Lagos-Abeokuta (Lagos/Ogun)
12. Lagos-Badagry (Lagos)

These routes have been selected for the 1st phase of the VAC.

The routes have been further broken down into lots. This is to ease management and development, ensuring that the entire route is adequately accounted for.

Certain criteria have been used to ensure that the most suitable 1st phase routes have been chosen.

Roads & Bridges

Twelve (12) OBC reports have been submitted by Federal Ministry of Works & Housing (Works) to the Commission for validation.

The Commission after review of the 12 OBC reports granted OBC compliance Certificate to all 12 reports on 21st December, 2020.

Presentation of OBC certificates to the Honorable Minister held 29th January, 2021 at the Ministry Conference room.

Next Step:
Commencement of procurement process for the selection of concessionaire.
RFQ adverts for HDMI projects in print media on 29th March, 2021
With deadline of submission on 3rd May, 2021.

Procurement
132Federal Ministry of Interior/Nigeria Immigration ServiceEstablishment of Nigerian Passport Application Support Centers in the US, Canada etc
(Solicited Proposal):

This project has been designed by the Nigeria Immigration Service (NIS) to alleviate the hardship, difficulties and inconvenience experienced by Nigerians living in USA, United Kingdom, Continental Europe, Asia and South America in their bid to procure or renew their international passports.
The Passport Application Support Centers will be equipped with appropriate facilities and data capture equipment with servers linked electronically to the Nigerian Embassies in the selected locations.
SecurityRFQ opening took place on 15thJuly, 2019.
Pre-qualification assessment on the received RFQ’s took place on 29th - 30th October, 2019.

NIS has received the Request for Proposals (RFP) from prequalified bidders.

Procurement
134Federal Ministry of Defence (FMoD)Concession of Defence Jetty, Marina Lagos
Messrs. Inspium Multi-Services Limited (IMSL) is proposing through a Build-Operate and Transfer (BOT) PPP model the rehabilitation and construction of the Ministry of Defence Jetty at Marina, Lagos.
Once Complete the following services will be available:
Ferry Service Parking, Helicopter Parking, Car Parking, Office Letting, Berthing Services, Afloat Repair Services, Warehousing Services, Restaurants & Café, Professional Training Services.
Security

The Commission issued an Outline Business Case Certificate November 8, 2017.

Full Business Case Certificate of Compliance was issued on 29th November, 2018

Procurement
135Federal Ministry of Police AffairsContingent Owned Equipment (COE)
Supply Own and Operate (SOO) for Peace Keeping Missions in CAR, South Sudan, Somalia, Dafur and Liberia
SecurityJoint OBC/FBC Compliance Certificate issued for presentation to FEC.
Next step: Submission of FBC to FEC for approval
Procurement
136Nigerian Correctional Service (formerly Prisons)Concession of Nigerian Prisons Land Swap Correctional Facility, Industrial Laundry Facility & Integrated Farm FacilitySecurityFirst phase of Negotiation with preferred bidders for both Land Swap Correctional Facility (Halcrow Infrastructure Consortium) and Integrated Farm Facility (Nestoti Consortium) projects took place on June 28, 2016Procurement
137Nigerian Correctional Service Rehabilitation, Expansion and Operation of the Nigerian Correctional Service Shoe, Garment and Leather Factories
An unsolicited proposal for the Rehabilitation, Expansion and Operation of the Nigerian Correctional Service Shoe Factory (NCS SF) Aba, Abia State under Public Private Partnership between Erojim Investment limited (EIL) and the Nigeria Prisons Service.
SecuritySequel to viability appraisal and FGN policy directive on local sourcing, the project scope was expanded to accommodate the establishment of a Garment Factory within the premises of Aba Shoe Factory and the establishment of Janguza Leather Factory Kano, Kano State in order to feed Aba Shoe Factory with high quality finished leather products.
After project re-negotiation and submission of a revised FBC, ICRC granted a compliance certificate on
6th May, 2020.

FEC approved the FBC on 7th October, 2020.

Commercial Close attained and Ground-breaking ceremony for the factory by the Minister of Interior, Rauf Aregbesola held on 28th January, 2021.

Procurement
138Ministry of Defence (MOD)The Naval Ship Dockyard, Lagos
This involves optimizing the capacity and functioning of the Naval Dockyard to attend to the maintenance services of existing fleet and facilitate building of new naval and commercial vessels under a PPP arrangement.
Security

FBC Certificate of Compliance was issued to FMoD on 11th September, 2018

The Commission revalidated and re-issued the FBC certificate of compliance to MOD on 16th September, 2020 after receiving:

A letter indicating their willingness to proceed with the project at the same investments levels and costs bearing in mind the effects of inflation and other possible post covid-19 pressures on the project cash flow.

A letter from their financiers indicating their willingness also to finance the project and to mention any possible term sheet variations if any, that may affect the project dynamics and implementation.

Next Step: Submission of FBC to FEC for approval

The Commission once again revalidated and re-issued the FBC certificate of compliance to MOD on 14th April, 2021

Next Step: Submission of FBC to FEC for approval

Procurement
139Federal Ministry of InteriorImmigration and Border Line Management
The Ministry seeks to use PPP procurement to design and develop an Intelligent Border Management System to reinforce the Federal Government’s capability to enhance border management processes, by comprehensively overhauling the surveillance and monitoring of passengers arriving or departing through the country’s major entry points
Security

The Commission has issued OBC Compliance Certification

Next Step:
Awaiting commencement process by Ministry

Procurement
140Nigeria Police ForceDevelopment of senior police officers quarters at Ikeja, Lagos through PPP arrangement
The redevelopment of 6.750 hectare of land at Ikeja into senior police officer’s housing units using 2.1 hectares of the land and use of 4.65 hectares for the development of 130 four-bedroom duplex housing units.
SecurityOBC Certificate of Compliance was granted to NPF on January 21, 2019.Procurement
141Federal Ministry of InteriorDevelopment and Deployment of a National Security and Civil registration system:
This involves the developing and deploying an ICT-based system to collate and up-to-date demographic, migration, biometric and bio-data on segments of the nation’s civil population, primarily employed in informal sectors, most of whom are generally invisible, to improve intelligence information on civilian population, in line with the Ministry’s civil defense and internal security mandate.
Security

The Commission has reviewed the submitted OBC and has advised the Ministry accordingly.

The Commission is awaiting the submission of an updated OBC.

Development
142Federal Ministry of InteriorProduction of Emergency Passports
Federal Ministry of Interior seeks to commence the production of Emergency Passports on a Public Private Partnership (PPP) Arrangement.
SecurityFBC Certificate of Compliance was granted on January 25th, 2019Procurement
143Federal Ministry of Defence

Supply, Operate & Maintain arrangement for equipment to Federal Ministry of Defence (FMoD) for leasing to the UN under CoE system on a letter of assist basis.

 

Security

ICRC attended a Pre-Negotiation meeting between FMoD and the Concessionaire (Messrs Barnes & Tubbies) on the draft Full Business Case (FBC) and the Concession agreement.

The Commission granted Conditional FBC Certificate of Compliance on 2nd September, 2019. Final FBC Certificate granted 5th December, 2019 on successful completion of the conditions

Next Step: Awaiting Presidential Approval.

Procurement
144Nigeria Customs Services (NCS)E-Customs Project (Establishment of a Digital/Paperless Customs Administration) under PPP arrangement.
The Nigeria Customs Service (NSC) has undertaken a survey of its operations and has identified challenges hindering its smooth operations. The NSC has decided to implement an e-Customs Solution, which is a program that will update the NSC ICT infrastructure and deployment of smart technologies under PPP arrangement.
Security

The Commission revalidated FBC Certificate for the proposed project on January 17th, 2020

FEC approved the FBC in 2020

Next Step:
Commercial close

Procurement
145Federal Ministry of Interior (FMoI)/ Nigerian Police Service (NPS)National Public Security Communication System (NPSCS)
The NPSCS project aims to provide of a robust, reliable, secure and independent multimedia communications system for the Police and other agencies. Using the latest broadband technologies both current and future network standards will be managed to deliver quadruple-play (4x) telecommunications services for improved capacity in crime prevention and investigation as well as a reduction in the need for physical manpower input in intelligence services and aid emergency services to respond more rapidly to urgencies.
Security

Bid conference held on Wed, 14th Aug, 2019 to select the Baseline Auditor for the NPSCS Network

Meeting of the subcommittee of the Network Baseline Audit of the NPSCS held on 20th  Aug, 2019
Presentation of report on the Network Baseline Audit of NPSCS to the Project Management Team (PMT) held on 29th Aug, 2019.

FEC Approval obtained Wednesday 16th December 2020

Next Step
Commercial close

Implementation
146Nigerian Correctional Services (NCS)

The Resuscitation of the NCoS Farm Center, Ozalla, Edo State

The Nigerian Correctional Service is desirous of exploring PPP options for the development and operations of the farm centers debuting with the Federal Correctional Farm Centre, Ozalla, Edo State as a pilot scheme.

SecurityThe Commission issued NCS an Outline Business Case Compliance Certificate on 6th July, 2021 to enable the project proceed to private sector procurement stage through a Swiss Challenge approachProcurement
147Federal Ministry of Youth and SportsPPPs involving the following:
i. Upgrading/rebuilding of National Stadium, Lagos
ii. Completion of Athletes’ hostel, Abuja
SportsPDT meeting held on September19th, 2018.  The Ministry has been advised to submit an OBC to the Commission. RFQ bids evaluated on 25th November 2020
Evaluation Team to submit report to PDT on 2nd December 2020

PDT Meeting held on Wednesday, the 2nd of December, 2020

Development
148Federal Ministry of Youth and SportsDevelopment of Multipurpose Facility at National Stadium, Abuja
The Federal Ministry of Sports & Youth Development seeks to develop Multipurpose Facility at National Stadium Abuja through PPP
Sports

Meeting on a proposal for Long Lease of Part of the Public Parking Lot in the National Stadium, Abuja held at the Federal Ministry of Youth & Sports Development (FMYSD) on March 27, 2018

RFQ Advert for the two projects published on the 31st August 2020.

RFQ advert extended by 2 weeks

Development
149Federal Ministry of Youth and SportsSponsorship And Promotion Of The National Sports Festival (NSF)SportsAttended the MOU signing ceremony for sponsorship, marketing and promotion of National Sports Festival on 11 Jul 2018.
Following request by the Ministry through letter on 6/09/18 for a waiver to allow Abuja National Stadium to bear the name 'GLO' for the next two years, the Commission replied requesting for the draft Agreement to be forwarded to it and Federal Ministry of Justice (FMoJ) for review before execution.
Development
150Federal Ministry of Youth and SportsThe Federal Ministry of Youth and Sports Development seeks to Concession a) National Stadium Complex & Athletes’ Hostel Surulere, Lagos. B) Athletes’ hostel AbujaSportsRFQ Advert for the two projects published on the 31st August 2020Procurement
151Federal Ministry of Industry, Trade and Investment/National Automotive CouncilDevelopment of World Class Training Centre of Excellence:
(Solicited Proposal): The National Automotive Design Development Council wishes to develop a World Class Training Centre of Excellence through a PPP.
Trade and InvestmentThe Commission held a meeting on 31st January, 2020 to establish a way forward on the project.
It was agreed an updated Business Case will be sent to the Commission for review on 9th March, 2020.
Procurement
152Federal Ministry of Industry, Trade & Investment / Tafawa Balewa Square Management Board (TBSMB)Rehabilitation, Management and Operation of the National Trade and International Business Centre, Lagos (NTIBC)
The development of the NTIBC was conceived against the background of the FGN’s desire to develop one-stop investment hubs in order to sustain economic growth by encouraging export, enterprise and investments. The Independence building was built in 1959. The building consists of 25 floors, has approximately 8,100 square meters and a separate parking lot directly opposite with an area of 2,650 square meters.
The proposed NTIBC building will be a mixed-use facility to cater for businesses on a let basis, provide space for TBSMB and also residential usage.
The proposed facility will be multi-functional, to include:
i. Office for agencies under the FMITI
ii. Offices for other government MDAs
iii. Information hub on trade & investment in Nigeria
iv. Office for Blue-Chip companies
v. Conference & meeting rooms
vi. Exhibition and banquet halls
Restaurants & lounge bar
Trade and InvestmentThe bid submission closed on 18th November 2020 (1600) and two (2) bids were received.

A presentation was made by both bidders on 23rd November 2020 for the Evaluation of Innovative solutions within the project.

Bid evaluations for technical and financials commenced on 30th November 2020, in Lagos.
The bid submission closed on 18th 18th November 2020 (1600) and two (2) bids were received.

A presentation was made by both bidders on 23rd November 2020 for the Evaluation of Innovative solutions within the project.

Bid evaluations for technical and financials commenced 30th November 2020 and concluded on 2nd December 2020 in Lagos.

A PDT meeting took place to consider the combined evaluation report for concessionaire selection on June 3, 2021.

Development
153Federal Ministry of Industry, Trade & Investment / National Automotive Council (NAC)Establishment of the Mechanic’s Villages
The mechanics’ villages’ project is an initiative of NAC, a body established pursuant to the National Automotive Council Act, Cap N8, Laws of the Federation of Nigeria, with responsibility for the development of the automotive industry in Nigeria.
The objective for the establishment of the mechanic’s villages is, among other things, to stimulate the growth and development of the mechanic business in a specialized and orderly manner. The project is aimed at developing the automotive value chain via the provision of 6 pilot modern mechanic villages in the nation’s 6 geopolitical zones.
Trade and Investment

Meeting for review and negotiation of concession fees held on February 21st, 2019

Site Visit took place on February 27th, 2019

Awaiting Sensitivity analysis to be run by both parties and to be sent to the Commission for review

Development
154Federal Ministry of Industry, Trade & Investment / Small and Medium Enterprises Development Agency of Nigeria (SMEDAN)Development of 23 Industrial Development Clusters (IDCs)
The objective of the project is to redevelop 23 Industrial Development Centers (IDCs) into Industrial Clusters across Nigeria (in 6 geopolitical zones) using the PPP Model.
Trade and InvestmentOBC Certificate of Compliance was granted on October 23rd, 2018 for six (6) identified IDCs namely; Idu, Maiduguri, Owerri, Ikorodu, Port Harcourt and Sokoto.Procurement
155Federal Ministry of Industry, Trade & Investment Federal Ministry of Industry Trade and Investment Abuja Head office Building Project
The Federal Ministry of Industry Trade and Investment is desirous to build their Abuja Head Office through a PPP Procurement method. Project Conceptualization is currently on-going.
Trade and InvestmentProject Conceptualization is currently on-going.Development
156Federal Capital Territory/ Abuja Infrastructure Investment Center (AIIC)IGR Automated Platform for AEPB:
Project Description (Solicited Proposal): The MDA proposes providing an automated system for managing revenue collections, via an e-Payment platform that incorporates Mobile POS devices and a powerful AEPB office revenue administration and monitoring platform.
Urban DevelopmentEvidence of competitive bidding process and all documentation and approvals during the process were sent by AIIC to the Commission on October 3, 2017
Next Step: Awaiting FBC submission for review.
Procurement
157Ogun Osun River Basin Development AuthorityK’MAOUN Complex in IJORA Lagos StateUrban Development

The Commission held a meeting with the Ogun Osun River Basin Development Authority and the project proponent on the 20th October 2020, to discuss the OBC reviewed by the Commission.

The OBC was updated addressing all the issues outlined by the Commission and submitted to the Commission for OBC Compliance Certificate.

OBC Compliance certificate was issued by the commission on the 12 December 2020
In the process of setting up PDT and PSC, OORBDA wrote to ICRC for nominations.

PDT and PSC inaugurated. In the process of engaging a TA to conduct the Swiss Challenge process.

Development
158Federal Ministry of Works & Housing And Council for the Regulation of Engineering in Nigeria (COREN)COREN Head Office Project
(Solicited Proposal): The proposal will involve the Construction of COREN head office complex in Abuja using PPP procurement methodology.
Urban DevelopmentThe Commission granted an OBC Certificate of Compliance on November 8, 2016 for the project
COREN has been advised to proceed to procurement.
Procurement
159Federal Capital Development Authority (FCDA)Automated Parking Centres
This involves the construction of Automated Parking Centres in designated car parks in the FCT.
Urban DevelopmentFCDA is in the process of procuring a Transaction Adviser to prepare an Outline Business Case to determine project viability and bankability.Development
160Federal Housing Authority (FHA)PPPs involving the following:
i. Development of new towns in Abuja at Kwali and Bwari Area Councils
ii. PPP to develop corporate head office of Federal Housing Authority (FHA) in Abuja located at the Central Business District of Abuja.
Urban DevelopmentFHA is in the process of procuring Transaction Advisers to prepare an Outline Business Cases.
Projects will soon be advertised for procurement of Transaction Adviser.
Development
161Federal Ministry of Works & Housing Marina Quayside Strip Project
The proposed project is a transformative urban/waterfront development Project intended to be a tourism centre that will provide Hotels, Condominiums, Commercial Complexes, Water Sports, Restaurants, Art Galleries, Cinemas, Shops, Car Parks, Bus Transport Terminals, Museums, Offices, Residential buildings, Rented Houses, Theme parks, Parks, Port Authorities, Cruise Ship Facilities, Jetties, Boardwalks, Marinas, Aquaria, Sports Complexes, Casinos, Medical Facilities and Marine Transport.
Urban Development

Outline Business Case Certificate of Compliance granted on August 16, 2017.

Meeting held with the PPP Unit regarding current status of project on 4th April, 2019. It was resolved that the PPP Unit would inform the project proponent to return from finance-sourcing abroad and conclude the pre-development phase requirements for the project.

ICRC and Ministry to agree on updated workplan with timelines for the project.

Development
162Federal Ministry of Works & Housing New Eko Development Project, (Lagoon City) in Lagos
The project proposal involves the Sand-filling and reclamation of water bodies within the vicinity of existing Banana Island Estate. The project would redefine the Banana Island landscape and complement the development of Lagos lagoon to reflect its mega-city status.
Urban DevelopmentThe OBC is currently a work in progress by the FMW&H.Development
163Federal Capital TerritoryLight Rail Lot 2 PPP Project
The proposed Abuja Light Rail PPP project includes the financing, designing, construction, operation and maintenance of the rail transit network route. The covering distance is 54.1 kilometers from Garki Area 11 passing through the interchange centre at Eagle Square to Gudu and down to Nyanya, Karu axis, in Abuja. It also connects to sector Centre D through Hilton Hotel, Gwarimpa FHA Estate and the light railway Lot 1 (Blue line currently under construction)
Urban DevelopmentA meeting was held on December 22, 2017 at the SGF's office where the private proponent (IRMG) made another presentation on the way forward with the project. No conclusive agreements were reached, due to absence of some stakeholders.  The meeting was adjourned to a later date.
New date to be communicated to the Commission.
Development
164National Commission for Museums and MonumentsLease of Land at National Museum, Jos for the development of Filling Station
The National Commission for Museums and Monuments seeks to develop part of its land via PPP
Urban DevelopmentThe Commission granted an OBC Certificate of Compliance on February 27, 2018Development
165National Sugar Development CouncilOperation and Management of Sugarcane Bio-Factory, Zaria
The Council is proposing a PPP procurement in the Management and Operation of the facility to make it more efficient and productive after sinking in so much money with little output.
Urban DevelopmentPDT met on March 23, 2018. ICRC has advised the Council of the need to procure a TA that will guide in the conduct of the Swiss Challenge procurement and also prepare a RFQ and RFP documents.Development
166Centre for Management DevelopmentDevelopment of CMD Headquarters, Abuja
The Centre for Management Development is desirous of constructing National Headquarters in Abuja.
Urban DevelopmentProfile of two contractors sent to the commission by CMD. The Commission reminded through letter of March 27, 2018 to develop and submit Project Structuring Report.Development
167Office of the Head of Civil Service of the Federation (OHCSF)The Concession of Ground Floor of the Federal Secretariat Complex, Phase II to Commercial Use under PPP Arrangement Modalities on how to commercialize the ground floor of the Office of the Head of Civil Service of the Federation (OHCSF) building complex as a PPP pilot project under PPP arrangement.
some of the possible services that can be considered in the proposed scheme:
- Creche/Nursery
- Supermarket
- Laundry
- Car Park commercialization
- Complementary Transportation to and fro across the various routes of the Federal Secretariat (Staff Bus)
Urban Development

ICRC issued Pilot Implementation Certificate on 10th July, 2019 to fast-track improved facility management via a pilot PPP arrangement.

Next step:
The head of Service is to obtain endorsement of the Federal Ministry of Justice and the approval of the president for the Implementation phase prior to signing the Pilot Concession Agreement.

Procurement
168Federal Housing AuthorityDevelopment of Federal Housing Authority (FHA) Shopping Complex, Gwarinpa, Abuja
FHA currently has a site office located on 2,500sqm along 3rd Avenue Gwarinpa. There is an existing bungalow housing the Annex office of the Federal Housing Authority on the land. The building will be demolished to give way for a modern shopping complex. The FHA Annex office will be relocated to a temporary location in Gwarinpa. On completion of the plaza, some of the offices will be retained for the FHA Annex.
Urban Development

OBC Certificate of Compliance was granted on June 12th, 2018

Bid opening held on July 11th, 2018 with two (2) proposals submitted for evaluation; which took place and none of the bidders met the requirements of the RfQ

Awaiting detailed report from FHA on the procurement process.

Procurement
169National Assembly/ PASAN Staff HousingThe National Assembly’s commitment to acquire housing for their civil service staff under the steer of the Parliamentary Staff Association of Nigeria (PASAN)Urban Development

Meeting held with NASS/ PASAN on 20th May, 2019 regarding reviewed PSR and way forward for project.

NASS/ PASAN have been advised to procure a TA to develop a standard PSR for the project.

Development
170Federal Radio Corporation of Nigeria (FRCN)FRCN Land Lease, Owerri, Imo State.
The Federal Radio Corporation of Nigeria is interested in constructing and developing mixed-use development on 14 Hectares of its 21.11 Hectare landed property at Km-15 Umuahia Road, Owerri, Imo State.
The project consists of a high-end luxury estate with recreational support facilities, luxurious hotel and office blocks for commercial purposes.
Urban DevelopmentThe Commission has reviewed the submitted OBC and has advised the Corporation accordingly.
The Corporation resubmitted an OBC for the project on November
9, 2020 and is currently under review
Financial Model resubmitted for further review on June 6, 2021
Development
171Federal Radio Corporation of Nigeria (FRCN)Federal Radio Corporation of Nigeria Properties
The Radio Corporation are desirous to develop its 10-Hectares of land into a mixed-use facility in Lagos.
Urban DevelopmentFBC Certificate of Compliance was granted to FRCN on October 28, 2018Procurement
172Niger Delta Development CommissionProposed Niger Delta Broadband Development Initiative (NDBDI) for a Region-Wide High-Speed Next Generation Broadband Infrastructure.
The NDBDI project is about the provision of Broadband Internet Access, Connectivity, and associated Services in the Niger Delta region.
The Commission will make a Developmental Contribution for the NDBDI project which will serve as a platform for the recommended SP to deliver the Broadband Internet Services to Subscribers at a reduced cost, using 4G technologies such as LTE (Long Term Evolution) and WAN (Wide Access Networks) which will deliver speeds of over 100Mbps.
Urban DevelopmentOBC Certificate issued on January 10, 2019Procurement
173National Hajj Commission of Nigeria (NAHCON)The NAHCON seek to engage a private sector operator to DFBOT a building at its landed property located at Hajj Complex, along Katsina Road, Kano State.  The plan is to build a 4blocks complex housing 376 units of shops, 8 portal steel blocks, a mosque, convenience and parking spaces.Urban DevelopmentChairman/CEO of NAHCON and his team visited the ICRC on the 5th November 2020 to discuss and explore areas of Public Private Partnership (PPP) opportunities in National Hajj Commission of Nigeria. A review of the project structuring report is ongoing.
OBC document submitted to ICRC on the 31st May 2021. OBC review on going. OBC Certificate of Compliance (NAHCON/OBC/001/2021) issued on the 9th of June, 2021
A letter dated 21st June, 2021 proposing to visit the project site for verification and assessment, was sent to NAHCON. Basic PPP Capacity training for NAHCON staff held on 18th -19th August 2021. NAHCON submitted the requested documents and the project is now considered for regularization.
Development
174Federal Ministry of Works and HousingFederal Site and Services Housing Scheme AVU-Owerri Imo StateUrban DevelopmentOBC certificate issued on July 22, 2021 
175Federal Capital Territory / Abuja Infrastructure Investment Center (AIIC)

Development of Jabi Lake Tourism & Recreation Development Project.

The development of the Jabi Lake area into a Tourism and Recreation hub.

Urban Development

OBC Certificate of Compliance issued for the project on February 19, 2021

In the process of engaging a TA to conduct a Swiss Challenge process

Development
176The Nigeria Police ForceRedevelopment of the Nigerian Police DIG Quarters at Maitama District, Abuja, through Public Private Partnership arrangementUrban DevelopmentAn OBC was submitted on August 23, 2021. It is currently under review.                         A meeting was held with the NP to review financial model figures to ensure VfM on the project.Development
176Federal Ministry of Education/University of Port-HarcourtAn unsolicited proposal for the development of 4000-bedspace standard green building hostel facilityUrban DevelopmentResponse letter sent to UNIPORT on the 24th of September, 2021Development